My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 5 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 5 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 4:36:18 AM
Creation date
9/12/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br />Allegion Group 4 Architecture Research + Planning, Inc. <br />May 07, 2025 Group 4 Project No. 22575-01 <br /> <br /> <br /> <br />087100-4 DOOR HARDWARE <br />B. Hardware items shall be individually packaged in manufacturers’ original containers, complete <br />with proper fasteners. Clearly mark packages on outside to indicate contents and locations in <br />hardware schedule and in work. <br />C. Provide locked storage area for hardware, protect from moisture, sunlight, paint, chemicals, etc. <br />D. Contractor to inventory door hardware jointly with representatives of hardware supplier and <br />hardware installer until each all are satisfied that count is correct. <br />1.7 WARRANTY <br />A. Provide warranties of respective manufacturers’ regular terms of sale from day of project <br />acceptance as follows: <br />1. Locksets: Seven (7) years. <br />2. Electronic: One (1) year. <br />3. Closers: Thirty (30) years. <br />4. Exit devices: Three (3) years. <br />5. All other hardware: Two (2) years. <br />1.8 MAINTENANCE <br />A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and <br />maintenance instructions as needed for Owner's continued adjustment, maintenance, and <br />removal and replacement of door hardware. <br />1.9 PRE-INSTALLATION CONFERENCE <br />A. Convene a pre-installation conference at least one week prior to beginning work of this section. <br />B. Attendance: Architect, Construction Manager, Contractor, Security Contractor, Hardware <br />Supplier, Installer, Key Owner Personnel, and Project Inspector. <br />C. Agenda: Review hardware schedule, products, installation procedures and coordination required <br />with related work. Review City's keying standards. City to provide keying schedule. <br />PRODUCTS <br />1.10 MANUFACTURERS <br />Item Manufacturer Acceptable Substitutes <br />Hinges Ives Hager, Stanley, McKinney <br />Locks, Latches <br /> & Cylinders Corbin Russwin Owner Standard <br />Exit Devices Von Duprin Or Approved Equal <br />Closers LCN Or Approved Equal <br />Push, Pulls <br /> & Protection Plates Ives Trimco, BBW, DCI <br />Flush Bolts Ives Trimco, BBW, DCI
The URL can be used to link to this page
Your browser does not support the video tag.