My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 5 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 5 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 4:36:18 AM
Creation date
9/12/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br />Allegion Group 4 Architecture Research + Planning, Inc. <br />May 07, 2025 Group 4 Project No. 22575-01 <br /> <br /> <br /> <br />087100-10 DOOR HARDWARE <br />installation of hardware units. Prepare a written report of current and predictable problems (of <br />substantial nature) in the performance of the hardware. <br />1.18 HARDWARE LOCATIONS <br />A. Conform to CCR, Title 24, Part 2; and ADAAG; and the drawings for access-compliant positioning <br />requirements for the disabled. <br />1.19 FIELD QUALITY CONTROL <br />A. Contractor is responsible for providing the services of an Architectural Hardware Consultant <br />(AHC) or a proprietary product technician to inspect installation and certify that hardware and its <br />installation have been furnished and installed in accordance with manufacturers’ instructions and <br />as specified herein. <br />1.20 SCHEDULE <br />A. The items listed in the following schedule shall conform to the requirements of the foregoing <br />specifications. <br />B. While the hardware schedule is intended to cover all doors, and other movable parts of the <br />building, and establish type and standard of quality, the contractor is responsible for examining <br />the Plans and Specifications and furnishing proper hardware for all openings whether listed or <br />not. If there are any omissions in hardware groups in regard to regular doors they shall be called <br />to the attention of the Architect prior to bid opening for instruction; otherwise, list will be considered <br />Complete. No extras will be allowed for omissions. <br />C. The Door Schedule on the Drawings indicates which hardware set is used with each door. <br />Manufacturers <br />Abbreviation Name <br />ACC Accurate Lock & Hardware Co <br />C-R Corbin Russwin Architectural Hardware <br />CAV Cavity Slider <br />CRO Crown Industrial <br />GLY Glynn-Johnson Corp <br />IVE H.B. Ives <br />LCN LCN Commercial Division <br />SCE Schlage Electronic Security <br />SCH Schlage Lock Company <br />STA Stanley Security Solutions <br />VON Von Duprin <br />WIK Wikk Industries <br />ZER Zero International Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.