My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10180772_1318 N. MCLEAN - Plan
PBA
>
Building
>
Plans
>
M
>
McLean Dr
>
1318 N McLean Dr
>
10180772_1318 N. MCLEAN - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2021 11:51:21 AM
Creation date
10/25/2020 5:21:06 PM
Metadata
Fields
Template:
Plan
Permit Number
10180772
Full Address
1318 N McLean Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Loyd W. Martin Solar Structures Engineering <br />2510 W. 237th St. #206 Torrance, CA 90505 Tel:1.310.464.1804 <br />Email: loydwmartin@gmail.com www.loydwmartin.com <br />Structural Calculations for a Roof Mounted Solar Photovoltaic System for: <br />Peou Residence <br />1318 N. Mclean Drive, <br />Santa Ana, CA 92703 <br />Applicable Codes: <br /> M No. C58724.91 <br /> * Exp. 3-31-15 * <br />\84 CIVIL 2./ <br />OF CA\-t50/ <br />2013 California Building Code, 2013 California Electric Code, <br />2013 California Mechanical Code, American Society of Civil Engineers <br />Standard ASCE 7-10 Minimum Design Loads for Buildings and Other <br />Structu res, 2012 American Forest & Paper Association National Design <br />Specification for Wood Construction, Local Municipal Code, and all other <br />codes which are adopted by reference or enacted by law. <br />Assumed Design Parameters: - .------ + - <br />The existing structure has been built under a building permit and is in its j <br />original condition. The existing roof structure is capable of its coderequired live load and the ability of the roof structure to support live loads EL#ck <br />has not been substantially reduced by the age of the structure, termites or U umesmold, or unauthorized modifications to the existing structure. Solar Energy alt:rations <br />Contractor shall make an inspection of the existing roof framing bystem <br />prior to installation of the roof mounted solar energy system to verify that The accer <br />the existing roof is capable of supporting minimum roof live loads. <br />Assumed Design Parameters:t <br />All 2x members are grade Douglas Fir #2 or better <br />All 4X members are grade Douglas Fir #1 or better \ DawAll Roof Connectors are Simpson Strong-Tie or Equal <br />All Concrete Foundations are fc = 2500 psi or stronger <br />Original Structure was built to the Type-V Wood Framed Standards <br />of the Applicable Building Code at the time of Construction. <br />2014-313 Smart Energy Peou Residence <br />Sht # 1 of 6 <br />Date: March 14, 2014
The URL can be used to link to this page
Your browser does not support the video tag.