Laserfiche WebLink
Installation steps for both s-curve and flat concrete tile* <br />11. <br />0 <br />STEP 1: Select o tile in the area of the roof rofter.STEP 2: Remove the tile by pushing and pulling. <br />It is usually held in place by a small nail. <br />STEP 3: Using an eledronic stud finder (recommended), <br />or other means, locate the rafter center. <br />Mark a reference point on the tile obove. <br />b«44> 1 -1 <br />Step 4: Seol the initial tile noil hole. Using 0 3/16" <br />drill bit and drill guide (FJ-Drill), drill pilot hole <br />along the rofter center <br />Step 5: Insert the log bolt and wosher through <br />the TileTra[® and apply fresh compatible <br />seolont to the base. <br />Step 6. Using a 1/2" socket, install the log bolt until <br />seated. Do not overlighten. The seolont should flow <br />ouhvord scaling any holes. <br />11 <br />Step 7: After bolting the bose to the roof, slide the upper carriage Step 8. Replace the tile by lining up the snap lines <br />into the correct position under the crown of the tile. For Flot tile,ond mork the drill location a«ordingly <br />slide the upper carriage near the middle of the tile. <br />Step 9: Using 0 1/20 carbide drill bit and ROTARY HAMMER <br />DRILL in hammer mode, drill through the tile. See online <br />video at www.proso/ar. com for details. <br />4 <br />1 <br />. <br />Ariz - <br />P , } +1'lI),1ILIP " 4(, 121| %iDIi] (j027 ' b. f 4..0 .1913 <br />Step 10: Insert threaded stud through tile and hand-tighten <br />to engage with base. Bind two 3/80 nuts (included) using <br />9/16" wrenches and tighten. <br />*Not recommended for clay or slate tiles. <br />Step 11: Unbind nuts and remove from stud. Apply <br />seolant around stud ot tile opening and compress <br />with Stainless Steel floshing (included) until seated. <br />Step 12: Fasten rail with lower and upper <br />3/8" nuts/washers as shown. <br />©Professional Solar Products, Inc. Mar. 2011. TileTrac"is a registered trademark and covered under Pat. #5,746,029