Laserfiche WebLink
Installation steps for both s-curve and flatconcrete tile* <br />0 <br />a <br />STEP 1: Select o tile in the areo of the roof rofter.STEP 2: Remove the tile by pushing ond pulling. <br />It is usually held in place by o small nail. <br />STEP 3: Using an eledronic stud finder (recommended), <br />or other means, locate the rafter center. <br />Mark o reference point on the tile above. <br />U „dEN' <br /><2-»2 <br />Step 4: Seal the initial tile nail hole. Using a 3/16" <br />drill bit ond drill guide (El-Drill), drill pilot hole <br />along the rofter center <br />Step 5: Insert the log bolt and wosher through <br />the TileTra[® and opply fresh compatible <br />seolant to the base. <br />Step 6: Using 01/2" socket, install the lag bolt until <br />seated. Do not overtighten. lhe seolont should flow <br />outword seoling any holes. <br /><m <br />Step 7: After bolting the base to the roof, slide the upper carriage Step 8. Replace the tile by lining up the snap lines <br />into the correct position under the [rown of the tile. For Flot tile,and mark the drill location accordingly. <br />slide the upper corrioge neor the middle of the tile. <br />Step 9: Using a 1/2" carbide drill bit ond ROTARY HAMMER <br />DRILL in hammer mode, drill through the tile. See online <br />video at www.prosolar. com for details. <br />\ <br />r---- <br />..?fq <br />U j <br />Step 10: Insert threaded stud through tile and hand-tighten <br />to engage with base. Bind two 3/8" nuts (included) using <br />9/16" wrenches and tighten. <br />*Not recommended for clay or slate tiles. <br />Step 11: Unbind nuts and remove from stud. Apply <br />sealant around stud at tile opening and compress <br />with Stainless Steel Hashing (included) until seated. <br />Step 12: Fasten rail with lower and upper <br />3/8" nuts/washers as shown. <br />©Professional Solar Products, Inc. Mar. 2011. TileTradis a registered trademark and covered under Pat. #5,746,029 <br />,