My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10180819_2309 N. LYON - Plan
PBA
>
Building
>
Plans
>
L
>
Lyon St
>
2309 N Lyon St
>
10180819_2309 N. LYON - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2021 5:00:03 PM
Creation date
10/25/2020 5:21:10 PM
Metadata
Fields
Template:
Plan
Permit Number
10180819
Full Address
2309 N Lyon St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version #27.9 <br />94*SolarCity ---... <br />3055 Clearview Way, San Mateo, CA 94402 <br />(888)-SOL-CITY (765-2489) 1 www. solarcity.com <br />February 19, 2014 <br />Project/Job # 927481 <br />RE:COVER LETTER <br />Project:Stanphill Residence <br />2309 N Lyon St <br />Santa Ana, CA 92705 <br />Digitally signed by Abe De Vera <br />Date: 2014.02.20 06:46:41 <br />-08'00' <br />To Whom It May Concern, <br />A jobsite survey of the existing framing system was performed by an audit team from SolarCity. Stfuctural review was based on site <br />observations and the design criteria listed below: <br />Design Criteria: <br />- Applicable Codes = 2013, CBC, ASCE 7-10, and 2012 NDS <br />- Risk Category = lI <br />- Wind Speed = 110 mph, !Exposure Category C <br />- Ground Snow Load = 0 psf <br />Note; Roof loads reduced per Code <br />On the above referenced project, the structural roof framing has been reviewed for loading from the PV system on the roof. The <br />istructural review only applies to the section(s) of the roof that directly supporting the PV system and its supporting elements. After this <br />review it was:.determined that the existing structure is adequate to carry the PV system loading. <br />The structural roof framing and the new attachments that directly suppoti the. gravity loading from PV modules have been ;reviewed <br />and determined to meet or exceed requirements of the 2013 CBC. <br />Please contact me with any questions or cohcerns regarding this project. <br />Sincerely, <br />Abe De Vera, P.E <br />Civil Engineer <br />Main: 888.765.2489, x7526 <br />email: adevera@solarcity.com <br />3055 Cleafview Way San Mateo. CA 94402 T (650) 638-1028 (888) SOL-CITY F (650) 638-1029 solarcity.com <br />·u- PO '21-4,1 A ,-1 + 4.gi . +C 2 Up t' - '0 , Fi * · '1% 1 AL - 9 'd,d. 2- -1" '1 -1 , 4*1 f·11 T¥»-1, till i;: 'i./E 1 1 '1[ VIFAL ·73·44*1 '-4 il )·481.iltar '4 <br />eptup PA r .4.'M "F: r)!IK ry# *i' 1-'A, •I•50,7 21'll•/,d,·ir' ,*/ : r't,11·,2, V
The URL can be used to link to this page
Your browser does not support the video tag.