My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10180824_2526 W. MANLY - Plan
PBA
>
Building
>
Plans
>
M
>
Manly Ave
>
2526 W Manly Ave
>
10180824_2526 W. MANLY - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2021 11:51:20 AM
Creation date
10/25/2020 5:21:10 PM
Metadata
Fields
Template:
Plan
Permit Number
10180824
Full Address
2526 W Manly Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version #17.0 <br />4<SolarCity <br />3055 Clearview Way, San Mateo, CA 94402 <br />(888)-SOL-CITY (765-2489) I www.solarcity.corn <br />February 28, 2014 <br />Project/Job # 927442 ECEI <br />RE:COVER LETTER <br />Project:DUMAUAL Residence <br />2526 W Manly Ave <br />Santa Ana, CA 92704 <br />MAR 1 0 2014 <br />City of Santa Ana <br />To Whom It May Concern, <br />A jobsite survey of the existing framing system was performed by an audit team from SolarCity. Structural review was based on site <br />observations and the design criteria listed below: <br />Design Criteria: <br />- Applicable Codes = 2013 CBC, ASCE 7-10, and 2012 NDS <br />- Risk Category = II <br />- Wind Speed = 110 mph, Exposure Category C <br />- Roof Dead Load = 7 psf (All MPs) <br />- Roof Live Load = 19 psf (All MPs) <br />- Ground/Roof Snow Load = 0 psf <br />On the above referenced project, the structural roof framing has been reviewed for loading from the PV system on the roof. The <br />structural review only applies to the section(s) of the roof that directly supporting the PV system and its supporting elements. After this <br />review it was determined that the existing structure is adequate to carry the PV system loading. <br />The structural roof framing and the new attachments that directly support the gravity loading from PV modules have been reviewed <br />and determined to meet or exceed requirements of the 2013 CBC. <br />Please contact me with any questions or concerns regarding this project. <br />Sincerely, <br />2740- **th <br />0/ S 5771 \4 0 1 11 <br />1 //*1 <br />Yoo Jin Kim, P.E. <br />Civil Engineer <br />Main: 888.765.2489, x5743 <br />email: ykim@solarcity.com Digitally sioned by Yoo Jin Kim <br />Date: 2014.02.28 08:18:26 -08'00' <br />3055 Clearview Way San Mateo, CA 94402 -r (650) 638-1028 (888) SOL-CITY F (650) 638-1029 solarcity.com <br />AZ ROC 243771. CA 7-SLB 888104. CO EC 2041. CT HIC 0632778 OC HIC 71,01486, =C HIS 71101488. 611 CT 29770, MA HIC 169572. MD MHIC '289·18. NJ I:,VHC616(600. <br />CR CCS 180493. PA 077343. TX TCLA 27006. WA aCl. SOLARC·91907. i 2013 SolarC,ty. All rights wsorved.
The URL can be used to link to this page
Your browser does not support the video tag.