My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10180863_2230 W. COTTER - Plan
PBA
>
Building
>
Plans
>
C
>
Cotter St
>
2230 N Cotter St
>
10180863_2230 W. COTTER - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2021 8:55:16 AM
Creation date
10/25/2020 5:21:12 PM
Metadata
Fields
Template:
Plan
Permit Number
10180863
Full Address
2230 N Cotter St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SolarMount Unirac Ode-Compliant Installation Manual :F UNI RAC <br />[3.3.2] Laying out the installing L-feet <br />L-feet are used for installation through <br />existing low profile roofing material, such <br />as asphalt shingles or sheet metal. They <br />are also used for most ground mount <br />installations. To ensure that the L-feet will <br />be easily accessible during flush installation: <br />Install <br />Second <br />• Use the PV module mounting holes <br />nearest the ends of the modules. <br />• Situate the rails so that footing bolt <br />slots face outward. <br />n <br />11 <br />11 <br />13 <br />11 <br />1' SolarMouHt Rails <br />The single slotted square side of the L-foot <br />must always lie against the roof with the <br />double-slotted side perpendicular to the <br />roof. <br />Foot spacing (along the same rail) and rail <br />overhang depend on design wind loads. <br />Install half the L-feet: <br />Lower 1 <br />roof <br />edge ¥ <br />0-· Instaft First . <br />11 <br />- <br />*- Rafters - <br />11 11 <br />11 <br />11 <br />11 <br />• If rails are perpendicular to rafters <br />(Fig. 23), install the feet closest to <br />the lower edge of the roof. <br />• If rails are parallel to rafters <br />(Fig. 24), install the feet for one of <br />the rails, but not both. <br />For the L-feet being installed now, drill pilot <br />holes through the roofing into the center of <br />the rafter at each lag screw hole location. <br />Squirt sealant into the hole and onto the <br />shafts of the lag screws. Seal the underside <br />of the L-feet with a sealant. Securely fasten <br />the L-feet to the building structure with the <br />lag screws. Ensure that the L-feet face as <br />shown in Figure 23 or Figure 24. <br />Figure 23. Layout with rails perpendicular to rafters. <br />Raftcrs , y <br />.. <br />.. <br />0. <br />.. <br />.. <br />.. <br />Install L-Feet <br />First <br />Hold the rest of the L-feet and fasteners <br />..aside until the panels are ready for the ••.. <br />installation. <br />1. <br />- Blocks -Install L-Feet Second <br />Figure 24. Layout with rails parallel to rajters. <br />Page <br />23
The URL can be used to link to this page
Your browser does not support the video tag.