My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163798 - Permit (2)
PBA
>
Building
>
Permits
>
A
>
Aster Pl
>
760 W Aster Pl
>
20163798 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 9:29:30 AM
Creation date
7/27/2021 9:29:29 AM
Metadata
Fields
Template:
Permit
Permit Number
20163798
Full Address
760 W Aster Pl
Permit ID
232614
Master ID Number
2017-137729
Project Name
Miscellaneous Counter1 Permit
Street Number
000760
Street Direction
W
Street Name
Aster
Street Suffix
Pl
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
7/31/2017
Issued Date
7/31/2017
Finalized Date
8/17/2017
Flood Zone
X-0602320144J
Description of Work
Install (28) roof mounted solar panels. FEES PD ON 10193670
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*,'SANTA <br />NA-tffi <br />Planning & Building Agency <br />Building Sarety Division <br />20 Clvic Cent€r Plaza <br />P.O. Box'1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Oetached STNGLE FAMtLy RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall b6 attached to Bach of TWO sets of plans, of <br />minimum 11" x 17" size. lf answeri NO to anv of the oues ons. Dlan check shall req u ired. <br />ProjectAaarees: 760 W. ASTER PL, SANTAANA, CA 92706 <br />contractor company Name: SOUTHW <br />Contractor Llcens" nu;n*r, <br />YES NO Are the follovylng applicable to the pioposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605. 11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounled to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of ths roop <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modulos do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system bo installed with a space of 2" minimum to lO" maximum between <br />the undeBide of modules and the surface of the roof? <br />Will lhe PV system be installed without using any ballast system or counter-weight <br />system? <br />Will lhe anchors be installed with a maximum horizontal anchor spacing of 6 feel <br />and is this maximum horizontal spacing shown on ths plans? <br />Will the minimum 5/16" lag screws be installed with a minlmum of 2-112 inch <br />embedment into roof raflers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage datails and manufactura/s pV support information.) <br />E tr <br />2 Etr <br />EXtr <br />Ertr <br />Ettr <br />trtr <br />&tr <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 Etr <br />I Ettr <br />10 Etr <br />I certify under penalty ot periury under the laws ot the State of Calitornia <br />pdnl x6mg. TRANG CONG PHAM <br />phone Number: 714 582 3909 <br />Signature <br />Date: <br />Emait Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />Rev:8/1712015 <br />the ova is true:
The URL can be used to link to this page
Your browser does not support the video tag.