Laserfiche WebLink
CERTIFICATE OF COMPTIANCE CFlR-ALT-02-E <br />Alterations to Space Conditioning Systems (formerly CF-1R-atT-HVAC)(Page 2 of 3l <br />D. Altered Space Conditioning System (Sections 150.2(b)1E and F) <br />01 02 03 04 05 o7 08 09 10 11 72 <br />System <br />ldentification <br />or Name <br />Heating <br />System <br />Type <br />Altered <br />Heating <br />Components <br />Heating <br />Efficiency <br />Type <br />Heating <br />Minimum <br />Efficiency <br />Value <br />cooling <br />System Type <br />Altered <br />coolinS <br />Components <br />cooling <br />Efficiency <br />Type <br />Cooling <br />Minimum <br />Efficiency <br />Value <br />Required <br />Thermostat <br />Type <br />New or <br />Replaced <br />Duct l-ength <br />New Duct <br />R-Value <br />Syslem 1 <br />centralgas <br />furnace <br />All new <br />heating <br />components <br />AF UE 80 Centralsplit <br />AC <br />coolinB <br />components <br />SEER 14 Setback <br />This field or <br />section is not <br />applicable <br />This field or <br />section is not <br />applicable <br />Reouired Documentation: <br />CF2R-MCH-01-E - Space ConditioninS Synems <br />' Duct insulation requirement for the new portions of supply-air and return air ducts or plenums: R6 {CZ 1-10, 12 and l3) and R8 (CZ 11 and 14 16) <br />CF2R and CF3R-MCH-20-H - Du.t LeakaSe Test required when heating orcoohn8 components are installed in ducted syltemr, or when mor€ than 40 ft ofduct lenglh is replaced <br />'LeakaSe rat€ compliance: <= 15% or <= 10% leakaS€ to o!,tside, or seal all acc€ssible leaks. <br />Cf2R and Cf3R-MCH'25 H RefriSerant Charge verification requi.ed when refriSerant containinS components are in5talled or altered (applicabl€ in CZ 2, 8-15). <br />cf2R and cF3R McH 23 Airflow Rate >= 300 CFM perton required when McH-25 is required. <br />Ixceptions: <br />- Duct systems regirtered with HtRS provider as previously seal€d are exempt from MCH-20 Ouct Laakage Testrng requirements. <br />' HeatinS'only systems and Air Handl€. Furnace ch.ng.s do not require verificatioi of Alr flow MCt!23,or RefrlsaGnt Charle MCH-25. <br />ExirtinS duct systems constructed, insulated or sealed with asbestorare exemrtfrom MCH-20 Du(t LetkaSe TestlB..quiEmenl5. <br />E. Entirely New or complete Replacement Duct System, with or without Equipment Changeout (Sections 150.2(b)1Diia and 150.2(b)1E, F) <br />This section does not apply to this project <br />F. Entirely New or Complete Replacement space Conditioning System (Section 150.2(b)1C) <br />This section does not apply to this project <br />ReeistrationDate/fime: 2017-07-0509:04:55ReBistration Number: 217-A020226442A-000-000-0000000-000o <br />CA Building EnerSy Efficiency Standards' 2016 Residential Compliance Report Versionr 2016.1 005 <br />Schema Version: rev 10/16 <br />HERS Provider: CaICERTS <br />Report Generated: 2017-07-05 09:04:19 <br />06