My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10193552 - Permit (2)
PBA
>
Building
>
Permits
>
R
>
Ross St
>
2119 S Ross St
>
10193552 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 9:30:52 AM
Creation date
7/27/2021 9:30:51 AM
Metadata
Fields
Template:
Permit
Permit Number
10193552
Full Address
2119 S Ross St
Permit ID
232226
Master ID Number
2017-137473
Project Name
Miscellaneous Counter1 Permit
Street Number
002119
Street Direction
S
Street Name
Ross
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
7/18/2017
Issued Date
7/19/2017
Finalized Date
7/26/2017
Flood Zone
X-0602320276J
Description of Work
Install (15) roof mounted solar panels. Per checklist.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
--{AN <br />NA <br />lit\$[ <br />,(ulLD{\c <br />ICI\iI <br />Planning & Building Agency <br />Buitding Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.Santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL{l cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill an the address ofthe project, contracto/s <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section*lf answering NO to any of the questions, plan check shall be required.* <br />Project Address:2119 SOUTH ROSS STREET SANTA ANA CA, 92707 <br />Contractor Company Name: Al r soLAR <br />contractor License Number: Q( qt f > <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so lhat the plane of the <br />modules (panels) are parallel to the plane of the rooP <br />Wll the PV system weigh maximum 3 pounds per square feet or less? <br />Vvill the PV syslem be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the rooP <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Vvill the PV system layout provide a three-foot wide clear access palhway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltaic Systems' <br />by OCFA? (Guideline available on the OCFA website: http 'irvww ccfa orq) <br />Do the plans show a maximum horizontal anchor spacing of6 feet? <br />Do the plans show a minimum ol 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufactureds PV support information.) <br />I certify under penalty of periury under the laws of the State of <br />YES NOtrtr <br />2 <br />3 <br />tr <br />tr <br />tr <br />tr <br />tr <br />tr <br />D <br />tr <br />tr <br />tr <br />tr <br />4 <br />5 <br />6 <br />7 <br />trtr <br />8 <br />I <br />10 <br />Print name ,J <br />CaliforniaJhat the above is true:,,.. ./: /t/-'c-Signature <br />Phone Number: (562)6194770 Dale: 07 lO7 12017 <br />x <br />X <br />x <br />X <br />Rev 2h712015 <br />r/4 q /ln/...r- r.-nEmail Address:
The URL can be used to link to this page
Your browser does not support the video tag.