My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10180986_1325 S. BAKER - Plan
PBA
>
Building
>
Plans
>
B
>
Baker St
>
1325 S Baker St
>
10180986_1325 S. BAKER - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2022 12:03:19 AM
Creation date
10/25/2020 5:22:01 PM
Metadata
Fields
Template:
Plan
Permit Number
10180986
Full Address
1325 S Baker St
Fully Linked
True
Document Relationships
10180986 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Baker St\1325 S Baker St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PHOTOVOLTAIC PERMI I <br />SYSTEM SIZE: 3.2KW DC / 2.8KW AC CEC <br />: *S#i'Fti.._:, · <br />9175 San Fernando Road <br />Sun Valley, CA 91331· <br />PLANNING DIVISION PH: (855) 277-7155 <br />F: (818) 337-7113 <br />APPROVED <br />SHEET INDEX <br />1 TITLE SHEET <br />2 SITE PLAN <br />3 ROOF PLAN <br />4 ELECTRICAL DIAGRAM / NOTES <br />5 ELECTRICAL SIGNAGE <br />SPECIFICATION SHEETS: <br />6 MODULE DATA SHEET <br />7 INVERTER DATA SHEET <br />8 RACKING DATA SHEET <br />SCOPE OF WORK <br />INSTALLATION OF A 3.2 KW ROOFTOP <br />PHOTOVOLTAIC SYSTEM INCLUDING <br />(10) MODULES AND (1) INVERTER. <br />GENERAL NOTES: <br />1. All equipment shall be installed in accordance <br />with the manufacturer's approved installation <br />method <br />2. All equipment and wiring shall be listed by UL or <br />a recognized testing agency by the local AHJ <br />3. Use minimum 8 AWG equipment grounding <br />conductor (EGC) when it is subject to sun <br />exposure and/or wet location, or install the <br />EGC in an approved raceway <br />4. All exposed wiring shall be sunlight resistant <br />and suitable for wet conditions <br />5. All working spaces and access about electrical <br />equipment shall be in compliance with NEC <br />110.26 <br />6: The installation is only. for utility interactive <br />systems as shown in the single line diagram <br />7. The short circuit current for 1 20/240V, single <br />phase service thal is 0 - 225A, is 10,000A or if <br />226 - 400A is 22,000A <br />8. All electrical equipment including the service <br />shall have a legible, visible, and durable <br />marking indicating the manufacturer name, <br />current, voltage, freqOency, and number of <br />phases <br />9. Each installed equipment, wiring and <br />overcurrent protecUve device (OCPD) shall <br />have a short circuit rating not less than the <br />available short circuit current at their input <br />terminals <br />10. The modules shall be made of either crystalline <br />or multi crystalline silicon material <br />11. All modules shall be roof mounted <br />12. The modules ratings shall be based on solar <br />irradiance standard test condition (STC) of <br />1000Whn'2 <br />PV EQUIPMENT LABELS AND NOTES: <br />1. All PV modules and associated equipment and <br />wiring material shall be protected from any <br />physical damage <br />2. All PV system components (equipment and <br />wiring) shall be listed by UL or a recognized <br />testing agency by the local AHJ <br />3. All wiring material shall be suitable for sun <br />exposure and wet locations <br />4. All field installed junction, pull and outlet boxes <br />located behind modules or panels shall be <br />accessible directly or by displacement of a <br />module(s) or panel(s) secured by removable <br />fasteners. <br />5. The roof mounted photovoltaic modules, panels, <br />or solar voltaic roll roofing material shall have <br />the same or better listed fire-resistance rating <br />than the building roof-covering material <br />6. Photovoltaic system installation shall comply <br />with+the NEC 690.61 requirement, loss of <br />interactive system <br />7. Exposed non-current carrying parts of module <br />or module frames, equipment and conductor <br />enclosure shall be grounded in accordance <br />with NEC 250.134 or 250.136(A) regardless of <br />voltage <br />8. Removal of an equipment from the system shall <br />not disconnect the (equipment grounding) <br />bonding connection between the grounding <br />electrode conductor and exposed conducting <br />services by means of a bonding jumper, NEC <br />690.48 <br />9. A bonding jumper shall be installed prior to <br />removal of a DWP-interactice inverter or tile <br />other equipment that does not disconnect <br />(remove) to maintain the system grounding, <br />NEC 690.49 <br />10. Live parts in PV source circuits and PV output <br />circuits over 150V to ground shall not be <br />accessible to other than qualified persons <br />while energized <br />DESIGN REQUIREMENTS FOR ROOF MOUNTED <br />SYSTEM: <br />1. Do not cover (mechanical or plumbing) vents <br />through the roof with the collector <br />2. When installed over a roof covering of wood <br />shakes or shingles with less than a Class B or <br />C rating, an aluminum or corrosion-resistant <br />iron substrate of 26 gauge minimum thickness <br />extending at least 6 in. beyond the outer <br />edges of the collector or collector groups is <br />required <br />MAR 2 7 2014 <br />City of Santa Ana <br />MASTER I.D. _ <br />FRACTOR: CA LlC# 8-477185 <br />WREMITECTUKAL <br />- 3/10/2014G.P.- - 315©ZE52113 UMi AA•UCED <br />ry. .--'4.-:,11 ..ik DATE__1-__EEUEZTNE PIEREBIES@Ri itj,' -.'.3,23· i.u-44§¢93ED'SY"'8-.'.-,.Z>UNA{Nd INSPECTJON*QUIRED:1, UalVhmS:andjae@@328#* ' ' NONE .%;Les =. ars OEt.I- 5-- 4401;GAI·t. ..'' 61- - ; i -F)NA}.2 · *82 62 8@E:* WEZt =t <br />-_-fie/&428Arta04«jili *444444491 -9-FOTORE,REVISIONS ' 2:09@8@nee 0% this wan and <br />r•4 l '<i,+ 9-5.N-rE,R®Ti:ON'.YIc-f·,1.ze.:AF: *CtgRA?hONSfMODIFI{JAI191/ -f'·-33:- --7 g.- -tiki-:Ate KfATg*.(43*td*MI*DH EXISTING4.- :[3* ts®EGNINd. 8EqUIEfy ' C-OFSAN- i <br />' I*P--- 0 h ' - 2 411'[2 - 5.0§&'ifrl ' -t*¢;5.pEANS !1210 Need. .--*i-:. '421. iS.1 1 02.-1-}a.-r .0.2-- -2-*COA79Nts:f_ 0 - h <br />C CD O <br />(1) a) A <br />Ploc\1LOCATION OF PROJECT iii U) CD <br />F,- 1 -CO 'A <O V, m10 ... <br />2 *432-6 - 10.-(D (N c <br />¤) m CO <br />THESE DRAWINGS ARE CONCEPTUAL <br />SHOW BASIC SYSTEM OPERATION ON. i. „ „ <br />NOT INTENDED TO INCLUDE ALL DEV <br />DETAILS NECESSARY FOR PROPER <br />ORIENTATION. IT IS THE RESPONSIB <br />THE INSTALLING CONTRACTOR TO E <br />THAT ALL NECESSARY DETAILS AND <br />ARE tNSTALLED TO GUARANTEE PROPER -- <br />OPERATION AND COMPLIANCE WITH LO< <br />BUILDING CODES. THIS DOCUMENT CONTAINS PROPFUE <br />INFORMAT,ON AND ITS RECEIPT OR I <br />7»2-I - I POSSESSION DOES NOT CONVEY ANY Ri -!'' <br />TO REPRODUCE. DISCLOSE ITS CON42*21 t.A.TO MANUFACTURE. USE. OR SELL AI243-Sm: 3,7 MAY DESCRIBE. REPRODUCTION. DI!:151§14 OR USE WITHOUT SPECIFIC WRITTEZ <br />AUTHORIZATION IS STRICTLY FORBI <br />AREA OF WORK _TITLE SH <br /> Plans <br />IVE <br />11 ..0 1 11 1 1 ,1 <br />1 <br />. <br />L .4 1 <br />43-1 -121/Ril/il"L' " <br />mimmrwilt.:tqful,10 li --- <br />1 <br />41*4' , '5 r - 1 1- -T, 1 K . i-- - 4--- 77-|*f 49--1 - . ' ti k- bi; - '4112 1 LIT-J;L-4 :4 ··T - <br />I -I | .1/2/W.•r <br />STREET VIEW <br />PROPERTY LINE <br />1 -17 , <br />0,64*319. r. -1 7 - <br />01 ... <br />i'- f *- ,_ .24-i ' .'*M 4,-C'Af' 3 .?,4 2? <br />&3' 9 1.. %41 ma <br />'1 - h <br />i '-£1\/AAI <br />1 T_ <br />T <br />1- <br />4 <br />J - r-- 1 <br />- rL <br />i <br />E <br />0 <br />HT
The URL can be used to link to this page
Your browser does not support the video tag.