Laserfiche WebLink
-,,SANTA <br />NA <br />IL$]t\c <br />.I[IIIDNC <br />lcilo <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Conter Plaza <br />P.O. Box 1988 (M-'19) <br />Santa Ana, CA92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />sol4l CBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the len questions and <br />sign the certilication section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerino NO to anv of the oues tions. olan check shall be reouired. <br />Prorect Address:dlt <br />Contractor Company Name: <br />Contractor License Number:c1131oto <br />{t <br />YES NO <br />Ertr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minjmum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing. anchorage details and manufacturer's PV support information.) <br />2 <br />3 <br />4 <br />5 <br />Su <br />Mu <br />6 <br />&strtr <br />Qtr <br />,. Etr <br />e EID <br />s Etr <br />ro. QD <br />I certify under penalty of perjury under the laws of the State of California that the above is true <br />Print Name Signature <br />Phone Number: (561\ !','L'lz1o Date: t- | t$i4^ <br />Rev: 11/19/2015 <br />f t I o t c.t <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />1. <br />Email Address: