STATE OE CALIFORNIA
<br />ALTERATIONS. HVAC
<br />CEC.CFlR.ALT{4,E R6v sed 03/15 CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE CFlR-ALT.O4.E
<br />Alterations - HVAC CZ 2, and 8-15 (formerly CF-1R-ALT-HVAC)(Page 1of 1)
<br />Permitfl
<br />5't5 F Hohart St
<br />Site Address Enforcement ABency:
<br />Santa Ana
<br />oate Prepared:
<br />2-22-18
<br />New Ducting, P/erums, tinesel
<br />Required R-value
<br />Conditioned
<br />tloor Area (sq tt)ThermostatEquipment Type Equipment Efficiency
<br />E Evaporator Coil
<br />E Condensing Unit
<br />E Compressor
<br />E LinesettrV
<br />_goyqAFU E
<br />-5EERETR
<br />HSPT
<br />coP O R-6 (CZ 2,8-131Ou.tine
<br />O R-8' (CZ 11,14,15) Du.tinr
<br />tr R-6 (o// cz'5) Ptenums
<br />E R'5 or R7.5) Lineset'
<br />Served by system
<br />_sqit
<br />dsetback
<br />(lf not olrcody
<br />present, musl
<br />be instolled)
<br />E Packaged
<br />Syttem
<br />dSplir System
<br />O Mini Splat
<br />El Furnace
<br />HERS VERIFICATION SUMMARY lnstaller determines work to be completed and matches to one of the option5 below. At permit application this
<br />form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filied forms allowed) and a copy left on site.
<br />d1. HvAc chanteout/Repair Required Compliance Oocurnents to be left on site for Final
<br />cFlR,AtT-02-E
<br />CF2R: MECH-01, MECH-20'HERS, MECH-(23 or 24)''HERS, MECH-2s-HERS'
<br />CF3Ri MECH'20'HER5, MECH-(23 or 24)-HERS'z, MECH-25-HERST
<br />All Equipment,
<br />Condenrer unit, Evaporator Coil,
<br />Compressor, TXV, Lineset,
<br />Air Handler/Furnacer (Can include new ducting)
<br />lnst.lle. Require.nent: Duct leakage {115%, or < 10% to outside, or seal all acce5sible leaks), Air Flow a 300 CFM/ton, Refrigerant Charge.
<br />Exempted from duct leakage testing if:
<br />E 1. Duct system registered with HERS provider as previousiy sealed, or E 2. There is les5 than 40 linear feet of duct in unconditioned space, or
<br />E 3. ExistinB duct systems are constructed, in5ulated or sealed with asbestos (list manufacture date of buildint _l
<br />E 2. New HVAC System Required Complian.e Oo.uments to be lefl on 5ite tor Final
<br />All new equipment and All New Ductsl
<br />including Mini Split
<br />CFlR.ALT-02.E
<br />CF2R: MECH-01, MECH-20-HERS, MECH-22'HERS, MECH-(23 or 24)-HERS'i, MECH-25-HERS'
<br />CF3R: MECH'20-HER5, MECH-22-HERS, MECH-(23 or 24)'HERS', MECH'25-HERs'1
<br />Mini Splits require CFlR-ALT-o2-E, CF2R-MECH-01, and (CF2R-CF3R) M€CH'25'HERS
<br />lnstalle. Requirement: Duct leakage S 6%, Fan Efficacy (.58w/CfM), Air Flow : 350 CFM/ton (or alternative), RefriSerant Charge
<br />E 3 All New Ducts with Replacement Required Compliance Oocuments to be left on site for Final
<br />All New Ductss and one or more of the followint
<br />replaced : Condenser Unit, Evaporator Coil,
<br />Compressor, TXV, tineset, Furnace2
<br />CFlR,ALT-02,E
<br />CF2R: MECH-01, MECH-20'HERS, MECH'(23 or 24)-HERS, MECH-25-HERS
<br />CF3R: MECH-20-HERS, MECH-(23 or 24)'HER5, MECH-25"HERS
<br />lnstaller Requirement: Duct leakate 3 5%, Air Flow 2 350 CFM/ton (or alternative), Refrigerant Charge
<br />Exempted from duct leakage testing if: D 1. Existing duct systems are constructed, insulated or sealed with asbestos
<br />O 4 New Ductint over 40 feel Required Compliance Documents to be left 06 site tor Final
<br />CFlR-ALT-02-E, CF2Rr MECH-20-HER5, CF3R: MECH'20 HERsNew ducting but les5 than All New Ductst
<br />lnstaller Required to: Duct leakage (115% or, S10% to outside or, or seal all accessible leak5)
<br />tr EXCEPTION: Existing duct systems constructed, insulated or sealed with asbestos
<br />IAll new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft rnstalled. Thrs includes in wal15, between floors etc.
<br />I Heating only systems and Air Handler/Furnace changes do not require Air Flow MECH'(23 or 24), or Refrigerant Charge verification MECH-25
<br />I All New Ducts is when at least 75 percent of the duct system is new duct material, and up to 25 percent may consist of reused parts from the
<br />dwelling unit's existing duct system (e.t., registers, grilles, boots, air handler, coil, plenums, duct material)
<br />'R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter
<br />with insulation as the followi^91.5-Zr-2y.",2.5-3I-21" ,3.51o 4I-Zh",5I-4%"
<br />Contractor (Documentation Author's /Responsible Designer's Declaration Statement)
<br />I certit the followint under penalty of perjury, under the laws of the State of Californra.
<br />1. The inlormation provided on this Certificate of Compliance it true and correct.
<br />2. I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document
<br />3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the
<br />requirements of Title 24, Parts 1 and 5 of the California Code of Regularions (CCR).
<br />4. That the enerW features and performance specifications, materia15, components, and manufactured devices for the buildinB desrgn or
<br />system desitn identified on this C€rtificate of Compliance conform to the requirements of Title 24, Part I and Part 6 of the CCR.
<br />5. The buildinS desiSn features or system design features identified on th;r Certificate of Compliance are consistent with the information
<br />provided on other applicable compliance documents, work5heets, calc!lations, plansind specificataons submitted to the enforcement
<br />agency for approval with this building permit application. -4
<br />Re5po.rble 0e5'8ne, Naoe
<br />Jane Recktenwald
<br />Retponrible De5rgner 5€nalure
<br />795556