Laserfiche WebLink
M215 QUICIK INSTALL GUIDE <br />[L--1 £ N E R G y <br />Installing the <br />M215 Microinverter (M215-60) <br />Read and follow all warnings and instructions in the M215 Installation and Operation Manual at <br />http://www.enphase.com/support before installing the M215 MicroinverterTM. <br />0 Install the Envoy Communications Gateway <br />Install according to the steps in the Envoy Quick insta// Guide.EnvoyLeave the Envoy running while you install the:microinverters so <br />that any required Envoy software upgrade completes.routerra h broadband; <br />// 00...00/0/00 <br />1 j <br />Warning: Do not remove power from <br />the Envoy if the LCD displays: <br />"Upgrading. . . Do Not Unplug." <br />AC power <br />1--1 cord <br />lai <br />Ethernet cable <br />0 Position the Enphase EngageTM Cable <br />a. Lay out the cabling along the installed racking for <br />the AC branch circuit. <br />terminator - <br />b. Install an appropriately rated, off-the-shelf junction <br />box at a suitable location on the racking. <br />See notes in Step Details on back h---y -Engage Cable <br />cable ties <br />connects to drop <br />connectors <br />M215 <br />11*D <br />drop connector <br />C>tz <br />AC iunction box <br />€0 DC connctors <br />Check the drop connector labels to <br />be sure that you have the right cable. <br />You must use 240 VAC cable for single phase <br />or 208 VAC cable for three-phase. <br />j <br />crl