Laserfiche WebLink
Terminate the Unused End of the Cable <br />a. Remove 60 mm (2.5") of the cable sheath from <br />the conductoi-s. <br />b. Check that all terminator parts are present. <br />hex wire <br />cap <br />nut organizer <br />1 <br />c. Slide the hex nut onto the cable. <br />d. Insert the cable end all the way into the <br />wire organizer (up to the stop) <br />e. Attach the cap. <br />bend wires down <br />--. into recesses of wire <br />organizer and <br />trim to length <br /> place cap over <br />the wire organizer <br />' <. hold the cap <br />4 1.' with the discon- <br />nect tool or a #2 <br />screwdriver <br />70. <br />- rotate the hex nut <br />- with your hand or <br />a wrench until the <br />latching mechanism <br />meets the base-do <br />not over torque <br />f. Attach the terminated cable end to the PV <br />racking with a cable clip or tie wrap. <br />0 Connect the Cable to the AC Junction Box <br />Connect the cable into the AC branch circuit <br />junction box. See notes in Step Deta#s cn back. <br />rres'.L \.\, 5/k 't <br />Complete the Installation Map <br />Build the map manually, or you can use the <br />ArrayGun feature from the Enphase Installer Toolkit <br />to build the system. For more information, go to <br />htto://enphase.com/Droducts/arravaun/. <br />To manually build the map, peel the removable se- <br />rial number label from each microinverter and affix <br />it to the respective location on the map iricluded <br />with this guide. <br />serial <br />nunlber .1 -- -t <br />labels <br />Connect the PV Modules <br />a. Mount the PV modules above the microinverters. <br />b. Connect the, DC leads of each PV module to <br />the DC input connectors of their corresponding <br />microinverter. <br />60-cell PV <br />module \5--IM-- 1__1 <br />verify <br />polarity on <br />at least one <br />unit pair <br />a*FA <br />10 <br />Never unscrew the hex nut. This action <br />can twist and damage the cable. <br />-