My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181084_3617 W. KENT - Plan
PBA
>
Building
>
Plans
>
K
>
Kent Ave
>
3617 W Kent Ave
>
10181084_3617 W. KENT - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 1:13:45 AM
Creation date
10/25/2020 5:22:12 PM
Metadata
Fields
Template:
Plan
Permit Number
10181084
Full Address
3617 W Kent Ave
Fully Linked
True
Document Relationships
10181084 - Permit
(Permit - Plan)
Path:
\Building\Permits\K\Kent Ave\3617 W Kent Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Terminate the Unused End of the Cable <br />a. Remove 60 mm (2.5") of the cable sheath from <br />the conductoi-s. <br />b. Check that all terminator parts are present. <br />hex wire <br />cap <br />nut organizer <br />1 <br />c. Slide the hex nut onto the cable. <br />d. Insert the cable end all the way into the <br />wire organizer (up to the stop) <br />e. Attach the cap. <br />bend wires down <br />--. into recesses of wire <br />organizer and <br />trim to length <br /> place cap over <br />the wire organizer <br />' <. hold the cap <br />4 1.' with the discon- <br />nect tool or a #2 <br />screwdriver <br />70. <br />- rotate the hex nut <br />- with your hand or <br />a wrench until the <br />latching mechanism <br />meets the base-do <br />not over torque <br />f. Attach the terminated cable end to the PV <br />racking with a cable clip or tie wrap. <br />0 Connect the Cable to the AC Junction Box <br />Connect the cable into the AC branch circuit <br />junction box. See notes in Step Deta#s cn back. <br />rres'.L \.\, 5/k 't <br />Complete the Installation Map <br />Build the map manually, or you can use the <br />ArrayGun feature from the Enphase Installer Toolkit <br />to build the system. For more information, go to <br />htto://enphase.com/Droducts/arravaun/. <br />To manually build the map, peel the removable se- <br />rial number label from each microinverter and affix <br />it to the respective location on the map iricluded <br />with this guide. <br />serial <br />nunlber .1 -- -t <br />labels <br />Connect the PV Modules <br />a. Mount the PV modules above the microinverters. <br />b. Connect the, DC leads of each PV module to <br />the DC input connectors of their corresponding <br />microinverter. <br />60-cell PV <br />module \5--IM-- 1__1 <br />verify <br />polarity on <br />at least one <br />unit pair <br />a*FA <br />10 <br />Never unscrew the hex nut. This action <br />can twist and damage the cable. <br />-
The URL can be used to link to this page
Your browser does not support the video tag.