My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1009 W Saint Andrew Pl - Misc. Permit
PBA
>
Building
>
Permits
>
S
>
St Andrew Pl
>
1009 W St Andrew Pl
>
Misc.
>
1009 W Saint Andrew Pl - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 11:22:02 AM
Creation date
7/27/2021 11:22:01 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
1009 W Saint Andrew Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
sol-01 cBc 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11"x17"size. lf answerinq NOto anvof the questions. plan check shall be r€quired. <br />Project Address: 1009 W SAINT ANDREW PL <br />Contractor Company 166s. Vivint Solar <br />Contractor License Numbor: 973756 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch <br />embedmenl into roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufactureds PV support information.) <br />tr2 <br />3 <br />4 <br />5 <br />tr <br />tr <br />trtrtrtr <br />trtr <br />Etr <br />6 <br />7 <br />8 <br />I trtr <br />10 mtr <br />I certlfy under ponalty of perJury under the laws of th <br />print Name. Kayla Horta <br />phone Number: 9 51-496-2292 <br />Email Address: kayla.horta@vivintsolar.com <br />e State of Callfornia that the <br />Signature <br />Rev: 8/29119 <br />3'46- OO126120 <br />is true: <br />...(l <br />I <br />o5'$t?o\ <br />$Planning & Building Agency <br />Building Safety Division <br />20 Clvlc Center Plaza ;'" <br />P.O. Box 1988 (Mlg) "f <br />Sanla Ana, CA 9270(l <br />(7r4) 647-5800 (\ <br />www.santa-ana.org ' <br />f. <br />RES!DENT!AL <br />s$$T.PHOTOVOLTAIC <br />CHECKLIST <br />o\t$\. <br />1 B tr
The URL can be used to link to this page
Your browser does not support the video tag.