Laserfiche WebLink
ncy <br />JUL <br />1,D <br />Rtt <br />€ <br />BCB, <br />, <br />Planning & Building Age <br />Building Safety Division <br />20 Clvlc Centei Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA927o2 <br />0r4) 647-5800 <br />wYvw.aanta-ana,org <br />,,a RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />\) <br />15 <br />-\u o <br />sol-01 cBc 2016 <br />Solar Photovoltaic (Pv) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall mmplete all sections, answerthe ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to anv of tho qusstions. plan check shall be rcouirod. <br />Proj ect Address: 1207 S RITA WAY <br />Contractor Company 11666; Vivint Solar <br />Contractor Licen5s llumpsn 973756 <br />YES NO <br />tr tr <br />Ar€ the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide cl€ar access pathways <br />per Seclion 605.1 1 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roor? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed wtrere the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the rool? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112 inch <br />embedmenl inlo roof rafters (with predrilled holes) and is this minimum embedmenl <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />2. <br />3. <br />4 <br />5 <br />6 <br />7 <br />8 tr <br />trtrtrtr <br />trtr <br />Etr <br />I trtr <br />10.mtr <br />I certify under penalty of periury under the laws of the State of <br />pdnl 113rng. Kayla Horta Signature: <br />phone Number: 9 51 -496-2292 <br />California that the <br />Email Address: kayla.horta@vivintsolar.com <br />g,s6.7l14l20 <br />o is true: <br />tr <br />tr <br />Rev: 8/29/19