Laserfiche WebLink
INDEX OF DRAWINGS <br />SHEET PV 1.0 - SITE PLAN <br />SHEET PV 2.0 - ROOF PLAN <br />SH'EET PV 3.0 - MOUNT DETAILS <br />JUNCTION BOX ATTACHED TO- <br />ARRAY USING MSI HARDWARE TO <br />KEEP JUNCTION BOX OFF ROOF, <br />92' OF 1" El\AT FROM JUNCTION BOX TO OTHER--7 <br />JUNCTION BOXES AND ELECTRICAL PANEL. ALL / <br />OPEN CABLE IS SUPPORTEDAND PROTECTED BY / <br />ARRAY. NO CABLE IS A ROOFTOP OR TRIPPING / <br />HAZARD. <br />- 3' SAFETY OFFSET FOR <br />ROOF ACCESS <br />N <br />PV SYSTEM SIZE: <br />6.615 kW DC <br />CITY OF SANTA ANA <br />tk./ <br />-V- j to- 15 -1 4 <br />45-1247#9 Co\€1090 „en <br />REVWED <br />L-- -L*ff//k <br />X <br />GENERAL NOTES: <br />1. ALL WORK SHALL CONFORM TO 2013 CBC, <br />2013 CRC, 2013 CPC, 2013 CMC, 2013 CEC, <br />2013 CALIFORNIA ENERGY CODE, 2013 CA c <br />GREEN CODE AND CITY ORDINANCES <br />INSPECTION NOTES: <br />r. <br />1 <br />1. THE FIRST REQUIRED INSPECTION SHALL * <br />BE FOR THE MODULE RACK SUPPORT BASES.(D 9 <br />MODULE RACK SUPPORT BASES SHALL BE L. <br />03 <br />INSTALLED PER MANUFACTURE'S C J <br />INSTALLATION INSTRUCTIONS.a) pco 1 <br />2. LADDERS SHALL BE PROVIDED AND 73 32 B <br />SECURED TO THE STRUTURE FOR INSPECTION U) E<Z <br />PURPOSES.O,) S °1 <br />a: 0 233. CONTRACTOR TO BE PRESENT FOR FIRST 020 1AND FINAL INSPECTIONS. <br />4. ALL INVERTERS, MOTOR GENERATORS,-* m -2 W <br />PHOTOVOLTAIC MODULES, PHOTOVOLTAIC <br />PANELS, AC PHOTOVOLTAIC MODULES, <br />SOURCE-CIRCUITS COMBINERS, AND O gID <br />CHARGE CONTROLLERS INTENDED FOR USE <br />IN A PHOTOVOLTAIC POWER SYSTEM SHALL <br />IDENTIFIED AND;LISTED FOR THE <br />APPLICATION PER 690.4(D).12 <br />5 THE DISCHARGE OF POLLUTANTS TO ANY 1 <br />/'1 -4STORM DRAINAGE SYSTEM IS PROHIBITED.U L:lf I <br />NO SOLID WASTE, PETROLEUM BYPRODIgYirY M SAN'SOIL PARTICULATE, CONSTRUCTION WAgE. 4-80 <br />M 11I / »-1- )41»7- 46 1 -'= IVIM 1 C n IA L W r, V VAO / Cy /M I C A UCM E r-Vt, C L-, WR <br /> CONSTRUCTION SITE OR BY CONSTRUCTION <br />-i story Structure tf ACTIVITIES SHALL BE PLACED, CONVEYED OR <br />DISCHARGED INTO THE STREET, GUTTER OR <br />.+ STORM DRAIN SYSTEM. <br />0 <br />lififill ftli /1 <br />REVISE <br />0- S <br />id <br />1 <br />1 <br />'liljilli <br />''llill, <br />ELECTRICAL. PANEL LOCATION,- <br />PV INTERCONNECTION POINT, <br />LOCIJBLE DISCONNECT SWITCH, <br />COMBINER PANEL <br />--UTILITY METER LOCATION <br />- <br />Cody E. Oram <br />State of California Licensed Contractor <br />No. 973756 Class C-10 & C-46 <br />(27) Yingli Energy YL245P-29b MODULES WITH- <br />(27) Enphase M215-60-2LL-S2x-ZC MICRO-INVERTERS. <br />(ONE ON THE BACK OF EACH MODULE) <br />LU Z <br />t= 5 <br />0 0- <br />SHEET <br />NUMBER: <br />PV SYSTEM SITE PLAN <br />1 STORY STRUCTURE <br />SCALE: 1/8" = 1'-0" <br />1