Laserfiche WebLink
Planning & Building Agsncy <br />Building Satety Division <br />20 Glvic Center Plaza <br />P.o. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(7r 4) 647-5800 <br />wwwsanta-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMTLY RESIDENCES Onty <br />lnstructlons: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certiflcation section below. A copy of this form shall be attached to each oi TWO sets of plans, of <br />minimum 11" x 17" size NO estion lan check shall be re <br />Project Address:1606 HURON, SANTA ANA, CA 92706 <br />SOUTHWEST SUN SOLAR, INC <br />contractorLiconseNumber: 1004667 <br />2 <br />3 <br />6 <br />7 <br />YES NO <br />m tr <br />8 Etr <br />AE <br />Etr <br />Etr <br />tstr <br />Etr <br />Ettr <br />atr <br />I <br />I cerlify under penalty of pe{ury under the laws of the State of California t the aqove is true: <br />print Name: MlMl NGO Signature: <br />phone Number: 714 582 3909 <br />Ema it Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />/t <br />-)c <br />*-SNTA <br />ANA-"ffi <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of lhe <br />modules (panels) are parallel to lhe plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feel or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weighl <br />system? <br />Will the anchors be installed with a maximum horizonlal anchor spacing of 6 feet <br />and is this maximum horizonlal spacing shown on the plans? <br />Will the minimum 5/16" lag screws bs installed with a minimum 012-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages ofthe plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />Date: <br />Contractor Company Name: <br />4. <br />5. <br />lO.EE <br />Re\:811712015