My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1739 W McEvoy Ln - Misc. Permit
PBA
>
Building
>
Permits
>
M
>
McEvoy Ln
>
1739 W Mcevoy Ln
>
Misc.
>
1739 W McEvoy Ln - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 11:22:44 AM
Creation date
7/27/2021 11:22:28 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
1739 W Mcevoy Ln
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*,SANTA <br />NAJ,ffi <br />Plannlng & Building Agency <br />Building Safety Division <br />20 Clvic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RES!DENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all seclions, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size lf answerino NO to anv ofthe ouestions. Dlan check shall be required. <br />Project Address:1739 IVCEVOY LN, SANTA ANA, CA 92706 <br />2 <br />YES NO <br />E tr <br />Etr <br />9. EE <br />10 EE <br />8tr <br />mtr <br />Etr <br />tstr <br />tstr <br />Ettr <br />Are lhe following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be inslalled where the modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum o'f 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including pro.iect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />4. <br />5. <br />6. <br />7 <br />I certify under penalty of perjury under the laws of the State of California <br />prjnt Name: MlMl NGO Signature <br />Date:phone Number: 714 582 3909 <br />Email Addres <br />Rev:811712015 <br />S' PERMIT@SOUTHWESTSUNSOLAR.COM <br />at bove is <br />3 Jo <br />contractor company Hame: SOUTHWEST SUN SOLAR' INC <br />contractorLicenseNumber' 1004667
The URL can be used to link to this page
Your browser does not support the video tag.