Laserfiche WebLink
DR <br />A <br />W <br />I <br />N <br />G <br /> <br />D <br />A <br />T <br />E <br />: <br />Ju <br />n <br /> <br />2 <br />6 <br />, <br /> <br />2 <br />0 <br />2 <br />5 <br /> <br />( <br />1 <br />1 <br />: <br />1 <br />1 <br /> <br />A <br />M <br />) <br />SHEET #: <br />JO <br />B <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />94 <br />1 <br /> <br />W <br /> <br />M <br />C <br />F <br />A <br />D <br />D <br />E <br />N <br /> <br />A <br />V <br />E <br />. <br />/ <br />9 <br />4 <br />1 <br /> <br />W <br />MC <br />F <br />A <br />D <br />D <br />E <br />N <br /> <br />A <br />V <br />E <br />. <br /> <br />U <br />N <br />I <br />T <br /> <br />2 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />NO <br />. <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />: <br />DA <br />T <br />E <br />: <br />BY <br />: <br />EN <br />G <br />I <br />N <br />E <br />E <br />R <br />: <br />DE <br />S <br />I <br />G <br />N <br />E <br />D <br /> <br />B <br />Y <br />: <br />DR <br />A <br />W <br />N <br /> <br />B <br />Y <br />: <br />RE <br />V <br />I <br />E <br />W <br />E <br />D <br /> <br />B <br />Y <br />: <br />PE <br />R <br />M <br />I <br />T <br /> <br />N <br />O <br />. <br />-- <br />C. <br />S <br />. <br />A. <br />C <br />. <br />C. <br />S <br />. <br />DE <br />S <br />I <br />G <br />N <br /> <br />G <br />R <br />O <br />U <br />P <br />: <br />ENGINEER OF RECORD: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />D <br />E <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />HO <br />M <br />E <br />RE <br />M <br />O <br />D <br />E <br />L <br />/ <br />( <br />N <br />) <br />AD <br />U <br />SSDSTA <br />N <br />D <br />L <br />E <br />Y <br /> <br />S <br />T <br />R <br />U <br />C <br />T <br />U <br />R <br />A <br />L <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br />CIV <br />I <br />L <br />- <br /> <br />S <br />T <br />R <br />U <br />C <br />T <br />U <br />R <br />A <br />L <br /> <br />E <br />N <br />G <br />I <br />N <br />E <br />E <br />R <br />S <br />Located at: <br />17940 Ventura Blvd. <br />Encino, CA 91316 <br />Call: <br />(213) 373-4513 <br />A. <br />C <br />. <br />ST <br />R <br />U <br />C <br />. <br /> <br />N <br />O <br />T <br />E <br />S <br />02-S1 <br />Footing, Stem Walls, Piers <br />Stepftg/Retain'g Foundation <br />Caisson, Piles, Grade Beams <br />Firm or individual to be responsilbe for the Structural Observation: <br />STRUCTURAL OBSERVATION PROGRAM <br />to be the Structural Observer. <br />DECLARATION BY OWNER <br />Signature Date <br />Observer is different from the Architect of Engineer of Record) <br />I, the Owner of the project, declare that the above listed firm or individual is hired by me to be the <br />DECLARATION BY ARCHITECT OR ENGINEER OF RECORD <br />I, the Architect or Engineer of record, declare that the above listed firm or individual is designated by me to <br />Hillside Special Anchors <br />Structural Observer. <br />Name: <br />conc beam <br />FOUNDATION <br />Mat Foundation <br />Owner: <br />PROJECT ADDRESS: <br />Description of Work: <br />(required if the Structural <br />FRAME <br />Masonry Wall Frame <br />Steel Braced Frame <br />Steel Moment Frame <br />STRUCTURAL OBSERVATION <br />(only checked items are required) <br />Concrete Moment Frame <br />Phone:(916) 333-9225 <br />WALL <br />Others: <br />Masonry <br />Concrete <br />Wood <br />Others: <br />Architect: <br />Calif. Registration: <br />Steel Deck <br />Others: <br />Wood <br />Concrete <br />DIAPHRAGM <br />PERMIT APPL. NO.: <br />Engineer: <br />AND DESIGNATION OF THE <br />STRUCTURAL OBSERVER <br />Standley <br />Standley C87675 <br />1.MATERIAL DELIVERED TO THE CONSTRUCTION SITE SHALL BE PROTECTED FROM RAIN OR <br />OTHER SOURCES OF MOISTURE. (9.407.4) <br />2.ALL STUDS, JOISTS, RAFTERS, AND BLOCKING'S SHALL BE DF-L NO. 2 AS GRADED BY <br />WWPGR, ALL POSTS AND BEAMS SHALL DF-L N0. 1 OR BETTER AS GRADED BY WWPGR. <br />UNO. <br />3.ALL LUMBER IN CONTACT WITH CONCRETE SHALL BE DF-LARCH PRESSURE TREATED. <br />4.ALL NEW SHEATHING USE FOR BRACING SHALL BE 15/32" CDX, 5-PLY PANEL <br />CONSTRUCTION WITH SPAN RATING OF 32/16 OR BETTER AS RATED BY AMERICAN <br />PLYWOOD ASSOC. <br />5.ANY NAIL IN CONTACT WITH PRESSURE TREATED LUMBER SHALL BE HOT-DIPPED <br />GALVANIZED OR STAINLESS STEEL. <br />6.BUILDING MATERIAL WITH VISIBLE SIGNS OF WATER DAMAGE SHALL NOT BE INSTALLED. <br />WALL AND FLOORING FRAMING SHALL NOT BE ENCLOSED UNTIL IT IS INSPECTED AND <br />FOUND TO BE SATISFACTORY BY BUILDING INSPECTOR. (9.505.3) <br />1.THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO STARTING OF WORK. <br />2.THE CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT CLEAR AND UNOBSTRUCTED <br />ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES (POWER POLES, <br />PILL-BOXES, TRANSFORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, <br />ETC.) OR TO THE LOCATION OF HOOK-UP. <br />3.THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY POWER LINES WHETHER <br />OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE TO COMPLY MAY CAUSE <br />CONSTRUCTION DELAYS AND/OR ADDITIONAL EXPENSES. <br />4.CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED <br />FOR SPRAYED-ON FIREPROOFING AND HIGH LOAD DIAPHRAGMS <br />5.CONSTRUCTION WASTE WILL BE HANDLED BY CITY OF LOS ANGELES CERTIFIED HAULER <br />AND SHALL BE REDUCED BY 50% OF ITS OVERALL WASTE. <br />CALIFORNIA WASTE SERVICES, PERMIT# PER-09-058 <br />621 W. 152ND ST., GARDENA, CA 90247 <br />1.ALL NON-EPOXY GROUT SHALL BE RAPID SET BRAND OR EQUIV. INSTALLED PER THE <br />MANUFACTURERS SPEC'S, LARR24654. <br />2.ALL EPOXY TYPE GROUT SHALL BE SIMPSON SET BRAND STRUCTURAL EPOXY OR <br />EQUIV. INSTALLED PER THE MANUFACTURERS SPECIFICATIONS, LA RR#25279. <br />3.CLEAN OUT ALL DRILLED BORINGS AND CRACKS PRIOR TO APPLICATION OF GROUT. <br />DEPUTY INSPECTION REQUIRED AT ALL TIME OF PROCEDURE. <br />4.CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED <br />FOR HIGH-LIFT GROUTING. <br />1.ALL STEEL REINFORCEMENT BARS SHALL BE 60,000 PSI YIELD STRENGTH CONFORMING TO ASTM STD <br />A615, UNLESS NOTED OTHERWISE. <br />2.ALL STEEL REINFORCEMENT TIES AND STIRRUPS SHALL BE 40,000 PSI YIELD STRENGTH CONFORMING <br />TO ASTM STD A615, UNLESS NOTED OTHERWISE. <br />3.ALL STEEL REINFORCEMENT HOOKS SHALL BE PER ACI318 STANDARD HOOKS SCHEDULE. <br />4.ALL BENDS IN REINFORCEMENT BARS SHALL BE MADE COLD. <br />5.STEEL REINFORCEMENT SHALL BE FREE OF LOOSE FLAKY RUST, MUD, OIL, AND OTHER COATINGS <br />WHICH MAY REDUCE BOND STRENGTH. <br />6.STEEL REINFORCING SHALL BE ACCURATELY PLACED IN CONCRETE FORMS WITH THE APPROPRIATE <br />CLEAR COVER MAINTAINED. <br />7.SPLICES IN STEEL REINFORCEMENT FOR SLABS AND RETAINING WALL SHALL BE A MINIMUM OF 40 BAR <br />DIAMETER OR 24 INCHES WHICH EVER IS LARGER. <br />8.SHOP WELDING FOR STEEL REINFORCEMENT SHALL BE PERFORMED IN A LADBS LICENSED FABRICATION <br />SHOP OR CALIFORNIA LICENSED FABRICATION SHOP. <br />9.FIELD WELDING FOR STEEL REINFORCEMENT SHALL BE PERFORMED BY A LADBS CERTIFIED WELDERS <br />OR CALIFORNIA LICENSED WELDER. CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY <br />INSPECTOR IS REQUIRED FOR FIELD WELDING. <br />1.ALL EXISTING FOUNDATIONS & FOOTINGS SHALL BE CLEANED OFF PRIOR TO POURING OF NEW <br />CONCRETE FOR PROPER BONDING. <br />2.CEMENT SHALL CONFORM TO THE SPECIFICATION FOR PORTLAND CEMENT ASTM C150. <br />3.WATER USED IN MIXING CONCRETE SHALL BE CLEAN AND FREE FROM INJURIOUS AMOUNTS OF OILS, <br />ACIDS, ALKALIS, SALTS, ORGANIC MATERIALS, OR OTHER SUBSTANCES THAT MAY BE DELETERIOUS TO <br />CONCRETE OR REINFORCEMENT BARS. <br />4.ALL CONCRETE WORK SHALL BE DONE WITH MINIMUM OF 3000PSI CONCRETE, UNLESS NOTED <br />OTHERWISE. <br />5.CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED FOR CONCRETE <br />STRENGTH GREATER THAN 2500 PSI, DRIVEN DEEP FOUNDATION, CAST-IN PLACE DEEP FOUNDATIONS, <br />ENGINEERING MASONRY, PRE-STRESSED CONCRETE, HIGH LOAD DIAPHRAGMS AND SPECIAL <br />MOMENT-RESISTING CONCRETE FRAMES. <br />6.ALL CONCRETE SHALL BE 3,000 PSI IN 28 DAYS & DEPUTY INSPECTION IS REQUIRED, UNLESS NOTED <br />OTHERWISE. <br />7.PLACEMENT OF STEEL REINFORCEMENT IN CONCRETE SHALL BE AS FOLLOWED: <br />A.3 INCHES FROM FACE OF CONCRETE CAST IF IT IS AGAINST AND/OR PERMANENTLY EXPOSED TO <br />EARTH <br />B.2 INCHES FROM FACE OF CONCRETE CAST IF IT IS EXPOSED TO EARTH AND/OR WEATHER. <br />C.1-1/2" INCHES FROM FACE OF CONCRETE CAST IF IT IS NOT EXPOSED TO WEATHER AND/OR IN <br />CONTACT WITH EARTH. <br />1.PRE-MOISTEN EXCAVATIONS FOR FOOTING & SLAB PRIOR TO POURING CONCRETE. THE CONSULTING <br />SOILS ENGINEER SHALL CHECK MOISTURE CONDITIONS. <br />2.ALL RECOMMENDATIONS OF THE CONSULTING GEOLOGIST MUST BE INCORPORATED INTO THE DESIGN <br />OR SHOWN AS NOTES ON THE PLANS IF APPLICABLE. <br />3.IF ADVERSE SOIL CONDITIONS ARE ENCOUNTERED, A SOILS INVESTIGATION REPORT MAY BE REQUIRED. <br />(1802.2.1) <br />1.THE OWNER SHALL EMPLOY A STATE OF CALIFORNIA REGISTERED CIVIL OR STRUCTURAL ENGINEER OR <br />LICENSED ARCHITECT TO PERFORM THE STRUCTURAL OBSERVATION. THE DEPARTMENT OF BUILDING AND <br />SAFETY (LADBS) RECOMMENDS THE USE OF THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE <br />STRUCTURAL DESIGNS THAT ARE INDEPENDENT OF THE CONTRACTOR. <br />2.THE STRUCTURAL OBSERVER SHALL PROVIDE EVIDENCE OF EMPLOYMENT BY THE OWNER OR THE <br />OWNER'S REPRESENTATIVE. A LETTER FROM THE OWNER, THE OWNER'S REPRESENTATIVE OR A COPY OF <br />THE AGREEMENT FOR SERVICES SHALL BE SENT TO THE BUILDING INSPECTOR BEFORE THE FIRST SITE <br />VISIT. <br />3.THE OWNER OR OWNER'S REPRESENTATIVE SHALL COORDINATE AND CALL FOR A MEETING BETWEEN THE <br />ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN, STRUCTURAL OBSERVER, <br />CONTRACTOR, AFFECTED SUBCONTRACTORS AND DEPUTY INSPECTORS. THE PURPOSE OF THE MEETING <br />SHALL BE TO IDENTIFY THE MAJOR STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT THE <br />VERTICAL AND LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW SCHEDULING OF THE <br />REQUIRED OBSERVATIONS. A RECORD OF THE MEETING SHALL BE INCLUDED IN THE FIRST OBSERVATION <br />REPORT SUBMITTED TO THE BUILDING INSPECTOR. <br />4.THE STRUCTURAL OBSERVER SHALL PERFORM SITE VISITS AT THOSE STEPS IN THE PROGRESS OF THE <br />WORK THAT ALLOW FOR CORRECTION OF DEFICIENCIES WITHOUT SUBSTANTIAL EFFORT OR UNCOVERING <br />OF THE WORK INVOLVED. AT A MINIMUM, THE LISTED SIGNIFICANT CONSTRUCTION STAGES ON THE <br />FOLLOWING STRUCTURAL OBSERVATION AND/OR SIGNIFICANT CONSTRUCTION STAGES TABLE REQUIRE A <br />SITE VISIT AND AN OBSERVATION REPORT FROM THE STRUCTURAL OBSERVER. <br />6.THE STRUCTURAL OBSERVER SHALL PREPARE A REPORT OF THE STRUCTURAL OBSERVATION REPORT <br />FORM IN/FORM.08 (PART 1) FOR EACH SIGNIFICANT STAGE OF CONSTRUCTION OBSERVED. THE ORIGINAL <br />OF THE STRUCTURAL OBSERVATION REPORT SHALL BE SENT TO THE BUILDING INSPECTOR'S OFFICE AND <br />SHALL BE SIGNED AND SEALED (WET STAMP) BY THE RESPONSIBLE STRUCTURAL OBSERVER. ONE COPY <br />OF THE OBSERVATION REPORT SHALL BE ATTACHED TO THE APPROVED PLANS. THE COPY ATTACHED TO <br />THE PLANS SHALL BE SIGNED AND SEALED (WET STAMP) BY THE RESPONSIBLE STRUCTURAL OBSERVER <br />OR THEIR DESIGNEE. COPIES OF THE REPORT SHALL ALSO BE GIVEN TO THE OWNER, CONTRACTOR, AND <br />DEPUTY INSPECTOR. ANY DEFICIENCY NOTED ON THE OBSERVATION REPORT WILL BECOME THE <br />RESPONSIBILITY OF THE STRUCTURAL ENGINEER OF RECORD TO VERIFY ITS COMPLETION BY HIM (HER), <br />OR BY A REGISTERED DEPUTY INSPECTOR AT THE DISCRETION OF THE STRUCTURAL OBSERVER. <br />7.A FINAL OBSERVATION REPORT AND THAT OF THE REGISTERED DEPUTY INSPECTOR MUST BE SUBMITTED <br />WHICH SHOWS THAT ALL OBSERVED DEFICIENCIES WERE RESOLVED AND STRUCTURAL SYSTEM <br />GENERALLY CONFORMS TO THE APPROVED PLANS AND SPECIFICATIONS. THE DEPARTMENT OF BUILDING <br />AND SAFETY (LADBS) WILL NOT ACCEPT THE STRUCTURAL WORK WITHOUT THIS FINAL OBSERVATION <br />REPORT AND THAT OF THE REGISTERED DEPUTY INSPECTOR (WHEN PROVIDED) AND THE CORRECTION OF <br />SPECIFIC DEFICIENCIES NOTED DURING NORMAL BUILDING INSPECTION. <br />8.THE STRUCTURAL OBSERVER SHALL PROVIDE THE ORIGINAL STAMPED AND SIGNED STRUCTURAL <br />OBSERVATION REPORT TO THE CITY'S DEPARTMENT OF BUILDING AND SAFETY INSPECTION OFFICE. <br />9.WHEN THE OWNER ELECTS TO CHANGE THE STRUCTURAL OBSERVER OF RECORD, THE OWNER SHALL: <br />A.NOTIFY THE BUILDING INSPECTOR IN WRITING BEFORE THE NEXT INSPECTION BY SUBMITTING <br />COMPLETED "STRUCTURAL OBSERVATION PROGRAM AND DESIGNATION OF THE STRUCTURAL <br />OBSERVER" FORM IN/FORM.08 (PART 2) <br />B.CALL AN ADDITIONAL PRE-CONSTRUCTION MEETING, AND <br />C.FURNISH THE REPLACEMENT STRUCTURAL OBSERVER WITH A COPY OF ALL PREVIOUS OBSERVATION <br />REPORTS. THE REPLACEMENT STRUCTURAL OBSERVER SHALL APPROVE THE CORRECTION OF THE <br />ORIGINAL OBSERVED DEFICIENCIES UNLESS OTHERWISE APPROVED BY PLAN CHECK SUPERVISION. <br />THE POLICY OF THE DEPARTMENT SHALL BE TO CORRECT ANY PROPERTY NOTED DEFICIENCIES <br />WITHOUT CONSIDERATION OF THEIR SOURCE. <br />10.THE ENGINEER OR ARCHITECT OF RECORD SHALL DEVELOP ALL CHANGES RELATING TO THE STRUCTURAL <br />SYSTEMS. THE BUILDING DEPARTMENT SHALL REVIEW AND APPROVE ALL CHANGES TO THE APPROVED <br />PLANS AND SPECIFICATIONS. <br />STRUCTURAL OBSERVATION <br />CONSTRUCTION STAGE ELEMENTS TO BE OBSERVED <br />CONCRETE <br />LUMBER <br />GROUT <br />STEEL REINFORCEMENT <br />EARTHWORK <br />1.CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED FOR FIELD <br />WELDING, HIGH STRENGTH BOLTING AND SPRAYED-ON FIREPROOFING. <br />2.LADBS LICENSED FABRICATOR IS REQUIRED FOR STRUCTURAL STEEL. <br />3.ALL WELDING SHALL BE SHOP WELDED BY A CERTIFIED WELDING SHOP, UNLESS NOTED OTHERWISE. <br />4.SHOP WELDING FOR STRUCTURAL STEEL & LIGHT GAUGE STEEL SHALL BE PERFORMED IN A CERTIFIED <br />FABRICATOR SHOP OR CALIFORNIA LICENSED FABRICATOR SHOP. <br />5.FIELD WELDING FOR STRUCTURAL STEEL & LIGHT GAUGE STEEL SHALL BE PERFORMED BY A CERTIFIED <br />WELDERS OR CALIFORNIA LICENSED WELDER. CONTINUOUS SPECIAL INSPECTION BY A REGISTERED <br />DEPUTY INSPECTOR IS REQUIRED FOR FIELD WELDING. <br />STEEL <br />CONSTRUCTION <br />DEAD LOAD: <br />HORIZONTAL SYSTEMS: <br />·ROOF CONSTRUCTION 15 PSF. <br />·CEILING CONSTRUCTION 10 PSF. <br />·FLOOR CONSTRUCTION 15 PSF. <br />VERTICAL SYSTEMS: <br />·LIGHT-FRAME WALL CONSTRUCTION 20 PSF. <br />·MASONRY WALL CONSTRUCTION 120 PCF. <br />·CONCRETE WALL CONSTRUCTION 160 PCF. <br /> LIVE LOAD: <br /> ROOF SYSTEMS: <br />·SLOPE < 4:12 20 PSF. <br />·SLOPE =/> 4:12 16 PSF. <br />·ROOF SOLAR 5 PSF <br />ATTIC SYSTEMS: <br />·W/O STORAGE SPACE 20 PSF. <br />·W/ STORAGE SPACE 30 PSF. <br />FLOOR SYSTEMS: <br />·BEDROOM AREAS 30 PSF. <br />·OTHER AREAS 40 PSF <br />WALLS: <br />·EXTERIOR WALLS 15 PSF. <br />·INTERIOR WALLS 10 PSF <br />DESIGN LOAD DATA <br />NO CONCRETE TOPPING ASSUMED IN DEAD LOAD <br />CALCULATIONS. CONTRACTOR TO VERIFY IN FIELD <br />GREEN NOTES <br />1.ANNULAR SPACES AROUND PIPES, ELECTRIC CABLES,, CONDUITS, OR OTHER OPENINGS IN THE <br />BUILDINGS ENVELOPE AT EXTERIOR WALLS SHALL BE PROTECTED AGAINST THE PASSAGE OF <br />RODENTS BY CLOSING SUCH OPENINGS WITH CEMENT MORTAR, CONCRETE MASONRY, OR METAL <br />PLATES. <br />2.FOR ALL NEW EQUIPMENT, AN OPERATION AND MAINTENANCE MANUAL INCLUDING, AT A MINIMUM <br />THE ITEMS LISTED IN SECTION 4.410.1, SHALL BE COMPLETED AND PLACED IN THE BUILDING AT THE <br />TIME OF FINAL INSPECTION <br />3.ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED <br />WITH TAPE, PLASTIC, OR SHEET METAL UNTIL THE FINAL SARTUP OF THE HEATING, COOLING AND <br />VENT. EQUIPMENT <br />4.THE VOC CONTENT VERIFICATION CHECKLIST SHALL BE COMPLETED AND VERIFIED PRIOR TO FINAL <br />INSPECTION APPROVAL. THE MANUFACTURERS SPECIFICATIONS SHOWING VOC CONTENT FOR ALL <br />APPLICABLE PRODUCTS SHALL BE READILY AVAILABLE AT THE JOB SITE AND BE PROVIDED TO THE <br />FIELD INSPECTOR FOR VERIFICATION <br />5.ALL NEW CARPET AND CARPET CUSHIONS INSTALLE DIN THE BUILDING INTERIOR SHALL MEET THE <br />TESTING PRODUCT REQUIREMENTS OF ONE OF THE FOLLOWING <br />1. CARPET AND RUG INSTITUTES GREEN LABEL PLUS PROGRAM <br />2. CALIFORNIA DEPT. OF PUBLIC HEALTH'S SPECIFICATIONS <br />3. NSF/ANSI 140 AT THE GOLD LEVEL <br />4. SCIENTIFIC CERTIFICATIONS SYSTEMS INDOOR ADVANTAGE <br />6.80% OF THE TOTAL AREA RECEIVING RESILIENT FLOORING SHALL COMPLY WITH ONE OR MORE OF <br />THE FOLLOWING <br />1. VOC EMISSION LIMITS DEFINED IN THE CHPS HIGH PERFORMANCE PRODUCTS <br />DATABASE <br />2. CERTIFIED UNDER UL GREENGUARD GOLD <br />3. CERTIFICATION UNDER THE RESILIENT FLOOR COVERING INSTITUTE <br />4. MEET THE CALIFORNIA DEPT. OF PUBLIC HEALTH'S SPECIFICATIONS <br />7.THE HEATING AND AIR CONDITIONING SYSTEMS SHALL BE SIZED AND DESIGNED USING ANSI/ACCA <br />MANUAL J-2004, ANSI/ACCA 29-D-2009 OR ASHRAE HANDBOOKS AND HAVE THEIR EQUIPMENT <br />SELECTED IUN ACCORDANCE WITH ANSI/ACCA 36-S MANUAL S-2004 <br />8.WHEN A SHOWER IS SERVED BY MORE THAN ONE SHOWERHEAD, THE COMBINED FLOW RATE OF ALL <br />THE SHOWERHEADS CONTROLLED BY A SINGLE VALVE SHALL NOT EXCEED 2.0 GALLONS PER <br />MINUTE AT 80psi, OR THE SHALL BE DESIGNED TO ONLY ALLOW ONE SHOWERHEAD TO BE IN <br />OPERATION AT A TIME <br />9.THE FLOW RATES FOR ALL PLUMBING FIXTURES SHALL COMPLY WITH THE MAXIMUM FLOW RATES IN <br />SECTION 4.303.1 <br />DESCRIPTION <br />NAILINGSCHEDULE <br />BLOCKING BETWEEN CEILING JOISTS OR <br />RAFTERS TO TOP PL. <br /># AND TYPE SPACING & LOCATION <br />ROOF <br />4-8D BOX (21/2″ × 0.113″) OR TOE NAIL <br />3-8D COMMON (21/2″ × 0.131″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />3-3" × 0.131″ NAILS <br />TOE NAIL <br />CEILING JOIST TO TOP PL. <br />4-8D BOX (21/2″ × 0.113″); ORPER <br />JOIST, 3-8D COMMON (21/2″ × 0.131″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />3-3″ × 0.131″ NAILS <br />PER JOIST, TOE NAIL <br />CEILING JOIST NOT ATTACHED TO <br />PARALLEL RAFTER, LAPS OVER <br />PARTITIONS <br />4-10D BOX (3″ × 0.128″); OR 3-16D <br />COMMON (31/2″ × 0.162″); OR <br />4-3″ × 0.131″ NAILS <br />FACE NAIL <br />CEILING JOIST ATTACHED TO PARALLEL <br />RAFTER (HEEL JOINT)TABLE 1, S-1 FACE NAIL <br />COLLAR TIE TO RAFTER, FACE NAIL OR <br />11/4″ × 20 GA. RIDGE STRAP TO <br />RAFTER <br />4-10D BOX (3″ × 0.128″); OR <br />3-10D COMMON (3″ × 0.148″); OR <br />4-3″ × 0.131″ NAILS <br />FACE NAIL EACH RAFTER <br />RAFTER OR ROOF TRUSS TO PLATE <br />3-16D BOX NAILS (31/2″ × 0.135″); OR <br />3-10D COMMON NAILS (3" × 0.148″); OR <br />4-10D BOX (3″ × 0.128″); OR <br />4-3″ × 0.131″ NAILS <br />2 TOE NAILS ON ONE SIDE AND 1 TOE <br />NAIL <br />ON OPPOSITE SIDE OF EACH RAFTER OR <br />TRUSS <br />ROOF RAFTERS TO RIDGE, <br />VALLEY OR HIP RAFTERS OR ROOF <br />RAFTER <br />TO MINIMUM 2″ RIDGE BEAM <br />4-16D (31/2″ × 0.135″); OR 3-10D <br />COMMON (31/2″ × 0.148″); OR <br />4-10D BOX (3″ × 0.128″); OR <br />4-3″ × 0.131″ NAILS <br />TOE NAIL <br />3-16D BOX 31/2″ × 0.135″); OR 2-16D <br />COMMON (31/2″ × 0.162″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />3-3″ × 0.131″ NAILS <br />END NAIL <br />WALL <br />DESCRIPTION # AND TYPE SPACING & LOCATION <br />STUD TO STUD (NOT AT BRACED WALL <br />PANELS) <br />16D COMMON (31/2″ × 0.162″)24″ O.C. FACE NAIL <br />10D BOX (3″ × 0.128″); OR <br />3″ × 0.131″ NAILS 16″ O.C. FACE NAIL <br />STUD TO STUD AND ABUTTING STUDS <br />AT INTERSECTING WALL CORNERS <br />(AT BRACED WALL PANELS) <br />16D BOX (31/2″ × 0.135″); OR <br />3" × 0.131" NAILS <br />12″ O.C. FACE NAIL <br />16D COMMON (31/2″ × 0.162″)16″ O.C. FACE NAIL <br />BUILT-UP HEADER (2″ TO 2″ HEADER <br />WITH 1/2″ SPACER) <br />16D COMMON (31/2″ × 0.162″)16″ O.C. EACH EDGE FACE NAIL <br />16D BOX (31/2″ × 0.135″)12″ O.C. EACH EDGE FACE NAIL <br />CONTINUOUS HEADER TO STUD <br />5-8D BOX (21/2″ × 0.113″); OR 4-8D <br />COMMON (21/2″ × 0.131″); OR <br />4-10D BOX (3″ × 0.128″) <br />TOE NAIL <br />TOP PLATE TO TOP PLATE <br />16D COMMON (31/2″ × 0.162″)16″ O.C. FACE NAIL <br />10D BOX (3″ × 0.128″); OR <br />3″ × 0.131″ NAILS 12″ O.C. FACE NAIL <br />DOUBLE TOP PLATE SPLICE FOR SDCS <br />A-D2 WITH SEISMIC BRACED <br />WALL LINE SPACING < 25' <br />8-16D COMMON (31/2″ × 0.162″); OR <br />12-16D BOX (31/2″ × 0.135″); OR <br />12-10D BOX (3″ × 0.128″); OR <br />12-3″ × 0.131″ NAILS FACE NAIL ON EACH SIDE OF END JOINT <br />(MINIMUM 24″ LAP SPLICE LENGTH EACH <br />SIDE OF END JOINT)DOUBLE TOP PLATE SPLICE SDCS D0, D1, <br />OR D2; AND BRACED WALL <br />LINE SPACING ≥25' <br />12-16D (31/2″ × 0.135″) <br />BOTTOM PLATE TO JOIST, RIM JOIST, <br />BAND JOIST OR <br />BLOCKING (NOT AT BRACED WALL <br />PANELS) <br />16D COMMON (31/2″ × 0.162″)16″ O.C. FACE NAIL <br />16D BOX (31/2″ × 0.135″); OR 12″ O.C. 3″ × <br />0.131″ NAILS 12″ O.C. FACE NAIL <br />BOTTOM PLATE TO JOIST, RIM JOIST, <br />BAND JOIST OR <br />BLOCKING (AT BRACED WALL PANEL) <br />3-16D BOX (31/2″ × 0.135″); OR 2-16D <br />COMMON (31/2″ × 0.162″); OR4-3″ × 0.131″ <br />NAILS <br />3 EACH 16″ O.C. FACE NAIL <br />2 EACH 16″ O.C. FACE NAIL <br />4 EACH 16″ O.C. FACE NAIL <br />TOP OR BOTTOM PLATE TO STUD <br />4-8D BOX (21/2″ × 0.113″); OR 3-16D BOX <br />(31/2″ × 0.135″); OR <br />4-8D COMMON (21/2″ × 0.131″); OR <br />4-10D BOX (3″ × 0.128″); OR <br />4-3″ × 0.131″ NAILS <br />TOE NAIL <br />3-16D BOX (31/2″ × 0.135″); OR 2-16D <br />COMMON (31/2″ × 0.162″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />3-3″ × 0.131″ NAILS <br />END NAIL <br />TOP PLATES, LAPS AT CORNERS <br />AND INTERSECTIONS <br />3-10D BOX (3″ × 0.128″); OR 2-16D <br />COMMON (31/2″ × 0.162″); OR <br />3-3″ × 0.131″ NAILS <br /> FACE NAIL <br />1″ × 6″ SHEATHING TO EACH BEARING <br />3-8D BOX (21/2″ × 0.113″); OR 2-8D <br />COMMON (21/2″ × 0.131″); OR <br />2-10D BOX (3″ × 0.128″); OR <br />2 STAPLES, 1″ CROWN, 16 GA., 13/4″ <br />LONG <br /> FACE NAIL <br />1″ × 8″ AND WIDER SHEATHING TO EACH <br />BEARING <br />3-8D BOX (21/2″ × 0.113″); OR3-8D <br />COMMON (21/2″ × 0.131″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />3 STAPLES, 1″ CROWN, 16 GA., 13/4″ <br />LONG <br />FACE NAILWIDER THAN 1″ × 8″ <br />4-8D BOX (21/2″ × 0.113″); OR <br />3-8D COMMON (21/2″ × 0.131″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />4 STAPLES, 1″ CROWN, 16 GA., 13/4″ <br />LONG <br />JOIST TO SILL, TOP PLATE OR GIRDER <br />4-8D BOX (21/2″ × 0.113″); OR 3-8D <br />COMMON (21/2″ × 0.131″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />3-3″ × 0.131″ NAILS <br />TOE NAIL <br />RIM JOIST, BAND JOIST OR BLOCKING TO <br />SILL OR TOP <br />PLATE (ROOF APPLICATIONS ALSO) <br />8D BOX (21/2″ × 0.113″)4" O.C. TOE NAIL <br />8D COMMON (21/2″ × 0.131″); OR 10D BOX <br />(3″ × 0.128″); OR <br />3″ × 0.131″ NAILS) <br />6″ O.C. TOE NAIL <br />RIM JOIST, BAND JOIST OR BLOCKING TO <br />SILL OR TOP <br />PLATE (ROOF APPLICATIONS ALSO) <br />3-8D BOX (21/2″ × 0.113″); OR 2-8D <br />COMMON (21/2″ × 0.131″); OR <br />3-10D BOX (3″ × 0.128″); OR <br />2 STAPLES, 1″ CROWN, 16 GA., 13/4″ <br />LONG <br />FACE NAIL <br />2″ SUBFLOOR TO JOIST OR GIRDER 3-16D BOX (31/2″ × 0.135″); OR 2-16D <br />COMMON (31/2″ × 0.162″)BLIND AND FACE NAIL <br />2″ PLANKS (PLANK & BEAM‒FLOOR & <br />ROOF) <br />3-16D BOX (31/2″ × 0.135″); OR 2-16D <br />COMMON (31/2″ × 0.162″)AT EACH BEARING, FACE NAIL <br />WALL <br />BAND OR RIM JOIST TO JOIST <br />3-16DCOMMON (31/2″ × 0.162″) <br />4-10 BOX <br />(3″ × 0.128″), OR <br />4-3″ × 0.131″ NAILS; OR <br />4-3″ × 14 GA. STAPLES, 7/16″ CROWN <br />END NAIL <br />BUILT-UP GIRDERS AND BEAMS, <br />2-INCH LUMBER LAYERS <br />20D COMMON (4″ × 0.192″); OR NAIL EACH LAYER AS FOLLOWS: 32″ O.C. <br />AT TOP AND BOTTOM AND STAGGERED. <br />10D BOX (3″ × 0.128″); OR <br />3″ × 0.131″ NAILS <br />24″ O.C. FACE NAIL AT TOP AND BOTTOM <br />STAGGERED ON OPPOSITE SIDES <br />AND: <br />2-20D COMMON (4″ × 0.192″); OR 3-10D <br />BOX (3″ × 0.128″); OR <br />3-3″ × 0.131″ NAILS <br />FACE NAIL AT ENDS AND AT EACH <br />SPLICE <br />LEDGER STRIP SUPPORTING JOISTS OR <br />RAFTERS <br />4-16D BOX (31/2″ × 0.135″); OR 3-16D <br />COMMON (31/2″ × 0.162″); OR <br />4-10D BOX (3″ × 0.128″); OR <br />4-3″ × 0.131″ NAILS <br />AT EACH JOIST OR RAFTER, FACE NAIL <br />BRIDGING TO JOIST 2-10D (3″ × 0.128″)EACH END, TOE NAIL <br />RAFTER SLOPE <br />3:12 <br />TABLE 1 <br />4:12 <br />5:12 <br />7:12 <br />9:12 <br />12:12 <br />RAFTER SPACING <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />4 <br />5 <br />7 <br />3 <br />4 <br />5 <br />3 <br />3 <br />4 <br />3 <br />3 <br />3 <br />ROOF SPAN (ft) <br />(inches)12 20 28 36 <br />REQUIRED # OF 16d COMMON NAILS <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />6 <br />8 <br />11 <br />5 <br />6 <br />8 <br />4 <br />5 <br />7 <br />4 <br />4 <br />5 <br />3 <br />4 <br />4 <br />3 <br />3 <br />4 <br />8 <br />10 <br />15 <br />6 <br />8 <br />12 <br />5 <br />6 <br />9 <br />4 <br />5 <br />7 <br />4 <br />4 <br />6 <br />3 <br />4 <br />4 <br />10 <br />13 <br />19 <br />8 <br />10 <br />15 <br />6 <br />8 <br />12 <br />5 <br />6 <br />9 <br />5 <br />6 <br />7 <br />3 <br />4 <br />5