My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2123 N Freeman St - Misc. Permit
PBA
>
Building
>
Permits
>
F
>
Freeman St
>
2123 N Freeman St
>
Misc.
>
2123 N Freeman St - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 11:23:10 AM
Creation date
7/27/2021 11:22:45 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
2123 N Freeman St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-o1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMILy RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO s ets of plans, of <br />minimum 11"x 17 <br />Project Address: <br />" size. lf answerinq NO to anv of the qu estions. olan check shall be required. <br />Contractor Company Name: <br />Contractor License Number:4rn 3,]q <br />2 <br />YES NO <br />Ptr <br />Etr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this mrnimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />3 Ptr <br />ptr <br />Ftr <br />4 <br />5 <br />6 ?tr <br />?tr <br />?tr <br />Ftr <br />atr <br />7 <br />B <br />9 <br />10 <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name Uirr,L tln nq Srgnature ill- <br />0/b v4t t-c/ a7 - <br />ft <br />Date: ?/l7l lct <br />I <br />*,,SNTA <br />NA,"'il]},,ffi <br />1 <br />Phone Number: <br />Email Address: <br />Rev 1111912015
The URL can be used to link to this page
Your browser does not support the video tag.