Laserfiche WebLink
.,r {\,',"\J <br />z.RtHesroeNnAL <br />^.P.kP{6voLTAlcor:''' GHEGKLTST <br />.4t <br />rr\N <br />cr$ <br />soL-01 cBc 2013 <br />Solar Photovoltaic (Pq Checklist for Detached SINGLE FAMILY RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten queslions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 'l " x 17" size. lf answerino NO to anv of the oues tions. plan check shall be reouired. <br />Project Address:504 STARBOARD ST, SANTA ANA, CA 92704 <br />contractor company Hame: SOUTHWEST SUN SOLAR, INC <br />contractorLicenseNumber: 1004667 <br />J <br />4 <br />5 <br />8tr <br />8tr <br />Etr <br />trtr <br />atr <br />6 <br />7 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooling layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to lhe plane of the rooP <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where lhe modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will lhe PV system be installed withoul using any ballast system or counter-weight <br />system? <br />Wll the anchors be installed with a maximum horizontal anchor spacing of 6 fe€t <br />and is this maximum horizonlal spacing shown on the plans? <br />Will lhe minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (wiih pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />I certify under penalty of periury under the laws ot the State of Cali <br />YES NOEtr <br />z. Eltr <br />a. Eltr <br />I Etr <br />10 Etr <br />p6nt Name: MlMl NGO <br />phone Number: 714 582 3909 <br />Signature: <br />Dale:,) <br />Emai I Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />6 <br />Rev:8/'1712015 <br />ta a <br />?rc <br />is true: <br />Planning & Building Agengy :: <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box l988 (M-19) <br />Santa Ana, C492702 <br />(714) 647-s8oo <br />www.sanla-ana.org <br />*,,SANTA <br />ANA,'fiffi