Laserfiche WebLink
GENERAL <br />THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND CORRELATION OF ALL ITEMS AND WORK <br />NECESSARY FOR COMPLETION OF THE PROJECT AS INDICATED BY THE CONTRACT DOCUMENTS. - - ----- <br />SHOULD ANY QUESTION ARISE REGARDING THE CONTRACT DOCUMENTS OR SITE CONDITIONS, -p}€ <,RO <br />CONTRACTOR SHALL REQUEST INTERPRETATION AND CLARIFICATION FROM THE ENGINEER BEFORE <br />BEGINNING THE PROJECT. THE ABSENCE OF SUCH REQUEST SHALL SIGNIFY THAT THE CONTRACTOR 'OCE <br />HAS REVIEWED AND FAMILIARIZED HIMSELF WITH ALL ASPECTS OF THE PROJECT AND HAS COMPLET <br />COMPREHENSION THEREOF. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE TO AL (1EPA,SAFETY REGULATIONS DURING CONSTRUCTION.CLED™C <br />THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. UNLES:TWI .1 01 <br />OTHERWISE SPECIFICALLY NOTED, THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION Ok 1 al m %110 <br />CONSTRUCTION LOADS. ONLY THE CONTRACTOR SHALL PROVIDE ALL METHODS, DIRECTION AND 111)IaugN <br />RELATED EQUIPMENT NECESSARY TO PROTECT THE STRUCTURE, WORKMEN AND OTHER PERSONS \ 01 91 61 <br />AND PROPERTY DURING CONSTRUCTION. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, ENGAGE <br />PROPERLY QUALIFIED PERSONS TO DETERMINE WHERE AND HOW TEMPORARY PRECAUTIONARY rlie *0,5 <br />MEASURES SHALL BE USED AND INSPECT SAME IN THE FIELD. ANY MATERIAL NOT AS SPECIFIED OR 10 held <br />IMPROPER MATERIAL INSTALLATION OR WORKMANSHIP SHALL BE REMOVED AND REPLACED WITH <br />SPECIFIED MATERIAL IN A WORKMANLIKE MANNER AT THE CONTRACTOR'S EXPENSE. <br />L. <br />THESE PLANS, SPECIFICATIONS, ENGINEERING AND DESIGN WORK ARE INTENDED SOLELY FOR THE 4PROJECT SPECIFIED HEREIN. MILLER CONSULTING ENGINEERS DISCLAIMS ALL LIABILITY IF THESE <br />PLANS AND SPECIFICATIONS OR THE DESIGN, ADVICE AND INSTRUCTIONS ATTENDANT THERETO ARE <br />USED ON ANY PROJECT OR AT ANY LOCATION OTHER THAN THE PROJECT AND LOCATION SPECIFIED <br />HEREIN. OBSERVATION VISITS TO THE JOB SITE AND SPECIAL INSPECTIONS ARE NOT PART OF THE 9 <br />STRUCTURAL ENGINEER'S RESPONSIBILITY UNLESS THE CONTRACT DOCUMENTS SPECIFY OTHERWISE. <br />NON STRUCTURAL PORTIONS OF PROJECT, INCLUDING BUT NOT LIMITED TO PLUMBING, FIRE <br />PROTECTION, LAND USE, SITE PLANNING, EROSION CONTROL, ELECTRICAL, MECHANICAL, FLASHING <br />AND WATER-PROOFING ARE BEYOND THE SCOPE OF THESE DRAWINGS AND ARE PROVIDED BY OTHERS. <br />EXISTING STRUCTURAL ELEMENTS ARE DESIGNED BY OTHERS. <br />CONTRACTOR TO VERIFY ALL CONDITIONS PRIOR TO FABRICATION OR INSTALLATION. ENGINEER OF <br />RECORD FOR THE PROJECT IS TO BE NOTIFIED IF CONDITIONS DIFFER FROM WHAT IS SHOWN ON THE <br />DRAWINGS. <br />BUILDING CODE <br />ALL PHASES OF THE WORK SHALL CONFORM TO THE 2013 CALIFORNIA BUILDING CODE, INCLUDING ALL <br />REFERENCE STANDARDS, UNLESS NOTED OTHERWISE. <br />CONCRETE <br />MIXING, PLACING AND CURING OF CONCRETE SHALL BE IN ACCORDANCE WITH THE AMERICAN <br />CONCRETE INSTITUTE, ACI 318 AND IBC CHAPTER 19. CONCRETE SHALL BE 2500 POUNDS PER SQUARE <br />INCH (PSI) MINIMUM AT 28 DAYS. <br />d'\4 <br />0\ <br />No. CO58302 m <br />m <br />'1%2EE*< . 17 - 14 <br />9570 SW Barbur Blvd Latitude Apartment Homes Monument Sign <br />Project Name Project #Suite One Hundred <br />Portland, OR 97219-5412 Location <br />2243 Santa Clara Avenue, Santa Ana, California <br />140325 <br />MILLER Client Ramsay Signs <br />CONSULTING (503)246-1250 <br />ENGINEERS Fax: 246-1395 By C.IM Ck'd .ON Date 4/17/14 5/ of 1Page <br />. <br />.t