Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />santa Ana, cA 92702 <br />(714) 647-5800 <br />r,vww.sa nta -a n a .org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-o1 cBC 2016 <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br />Southwest Solar lnc. <br />4 <br />5 <br />3 <br />6 <br />7 <br />YES NO1 Atr <br />2 aa <br />sltr <br />da <br />@a <br />da <br />10 f,n <br />EItr <br />Ua <br />Uo <br />1012298: C-l0 <br />Are the following applicable to the proposed proiect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum o'f 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including pro.iect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />8 <br />I <br />I certify under penalty of perjury under the laws ofthe State of California that the above is true: <br />p6nt Name: Alexander Wickman <br />Phone Number: (949) 521-3288 9u6.0612912020 <br />Email Address: permittingsws@gmail.com <br />Rev: 8/29/'19 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. <br />802 E Buffalo Ave. Santa Ana, CA 92706 <br />Signature: