My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181208_2031 S. ARTESIA - Plan
PBA
>
Building
>
Plans
>
A
>
Artesia St
>
2031 S Artesia St
>
10181208_2031 S. ARTESIA - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 12:02:12 AM
Creation date
10/25/2020 5:22:24 PM
Metadata
Fields
Template:
Plan
Permit Number
10181208
Full Address
2031 S Artesia St
Fully Linked
True
Document Relationships
10181208 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Artesia St\2031 S Artesia St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Utuoci #*Oun0 27®2 <br />RE : <br />Q -2 6 32 6 -- -=i <br />17-J, 0-xM o J <br />3%:bg222- <br />@*El&21 1 <br />t <br />a <br />b <br />(Nal»10•ON©00• <br />8 <br />Z <br />i <br />W <br />3 <br />1 <br />2 <br />€xPOSITION n,xm,TING inSTRUCTIOns - EAS'-PV - <br />Installation Tools Required: Tape Measure, Roofing Bar, Chalk Line, Stud Finder, Caulking Gun, <br />1 Tube of Appropriate Sealant, Drill with 7/32" long bit, Drill or Impact Gun with 1/2" Deep <br />Socket. <br />2 4 .5 <br />locate, choose, and mark centers of rafters to Uft Composition roof shingle with Roofing Bar Slide Mount into desired position. Remove any <br />be mounted. Select each row course of roofing just above placement of Quick Mount.nails that conflict wiui getting Mount flush with 0 <br />for Mount placement of Quick Mounts.front edge of shingle course. Mark center for <br />drillirg, <br />Using drill with 7/32· long bit. drill pilot hole Clean offany sawdust, and fill hole with Seal- Slide Mount back into position. Prepare Hanger <br />into roof and rafter, taking care to drill square ant.Bolt with 1 Hex Nut and 1 Sealing Washer, insert <br />to the roof. Do not use Mount as a drill guide.through Block into hole and drive Hanger Bolt <br />into rafter, tightening to 13 foot Pounds. <br />.. C' 1 <br />0 <br />8 <br />94 I.ZA.ftib 4,)*KIU; I-*,5813=7.3 -Frr,fjfoid * You are now ready for the rack of your Q==,-··-·a==Z=5-24,&.1 choice. Follow all the directions of the v <br />rack manufacturer as well as the module <br />manufacturer. <br />5 <br />3I <br />an <br />8 <br />11 <br />/. <br />Insert EPDM Rubber Washer over Hanger Bolt Jsing the Rack Kit Hardware, secure the rack of <br />into Block.your choice (see 9 •). Tighten to 16 foot pounds. <br />All noting manufacturers' written instructions <br />must also be followed by anyone modifying a <br />roof system. Please consult the roof manufac- <br />turers' soecs and hshictions prior to touching <br />the ,oof. <br />For Questions Call 925-687-6686 <br />QM-PV-Comp-Install©2011 <br />www.quickmountpv.com <br />4 of 4 <br />info@quickmountpv.com <br />Aug2O11 <br />.. <br />Racking of ChoiceNot Included <br />12 <br />-61 <br />0 <br />12 <br />1--1----full__3 <br />3 <br />« t»VUt--0 <br />DESCRIPTION <br />QTY. <br />Sheet .050'b<12kl 2"Aluminum <br />1
The URL can be used to link to this page
Your browser does not support the video tag.