My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181208_2031 S. ARTESIA - Plan
PBA
>
Building
>
Plans
>
A
>
Artesia St
>
2031 S Artesia St
>
10181208_2031 S. ARTESIA - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 12:02:12 AM
Creation date
10/25/2020 5:22:24 PM
Metadata
Fields
Template:
Plan
Permit Number
10181208
Full Address
2031 S Artesia St
Fully Linked
True
Document Relationships
10181208 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Artesia St\2031 S Artesia St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Structural Calculations -Roof Mounted Solar System - 2 arrays April 22, 2014 <br />job: Luis Reyes Contractor: Sunpro Solar (Bob Kornmann) <br />2031 South Artesia 34859 Frederick St. Suite 101 <br />Santa Ana, Ca. 92704 * (714) 915-8744 Wildomar, Ca. 92595 * (951) 813-5408 <br />Description: (12) solar panels (217 total sq ft) mounted in (2)arrays on (5) lines, 79 total feet of Sun <br />Frame rails supported by (23) standojfs connected to roof with (1) lag screw each through roof <br />diaphragm (sealed) and supported by 2x4 trusses, 24 " c/c on south & east facing roofs ofexisting <br />1-story residence with standard flush mount on 3:12 pitch comp roofatjob address shown above.Area <br />at bases to be patched with new roof sealant per Professional Solar Products installation instructions. <br />Page 5 <br />Worst Case loading considering all trusses and both arrays: <br />wdl = 12.4 plf (6.2 psfx 2' dc trusses) see page 4 <br />Mmax < 191 it-lb (array 1), V 1145 ib (D+L array 2-0= 1.25 stress increase), <br />Lmax = 6.04' (array 2), <br />Vnet uplift = /-115 lb (arrayx)+ 20 lbunifdead load+ 16 lbpointload/ = 79 lb < V - OK <br />Vnet uplift at eaves = /-1411b (array l)+ 60 tb unif dead load + 211bpoint load/=60lb< V -OK <br />If-1 ties or (3) 8d Mails each truss to plate - OK (3 - 8d nails allow 456 lb, H-1 allow 450 tb) <br />Mnet uplift = /-206 ft lb (array 1)+ 26ft lb unif dead load + 46 ft lb point load / = 133 ft lb <M-OK <br />Unif load: Mmax = 0.08 wL x L and Rmax = 0.607 wL, where continuous over supports <br />Unif DL deflection = 0.027" max < 0.15" allowable, OK (I = 4.29 in4th &E= 1.7 x10 6th psi) <br />(defl = .0069 wL4th(1728)/EI, max @ .44L from lowest end - where continuous over supports) <br />4 = 1.2" (2 x4 - OK) (Fv =95 psi) <br />1.b = 2.6" (2 x4 - OK) (Fb = 875 psi) <br />Dead load deflection = 0.03 " unif + 0.02" = 0.05 " < 0.15 " (L/480) - OK <br />Wind Download Deflection: 0.06" (array 1) < 0.26" (L/240) - OK <br />Wind Download + dead loaddeflection = 0.11" < 0.34" (L/180) - OK <br />Dead Load defl + Live Load defl = 0.05" DL + 0.07" LL = 0.12" < 0.40" (L/180) - OK <br />Negative net uplift deflection: /-0.10" + 0.05 "/ = 0.05 " < 0.26" (L/240) - OK 4€ 20£. 1.4- <br />(Fl--s- <br />Ii_ nnt- 4/snn <br />The 2x4 top chords of the trusses at 24" c/c can handle the additional dead 101*is*al@*WiiRkm:-ry, .g*down loads & uplift loads of the solar systems with the spans as shouy.]ron'notn,tfuss la,tourier <br />diagrams herein for both Arrav 1 & Array 2)./ / I4%(«291<, i ice Z->•r <br />f <br />Lawrence R. Phelps, RCE 35280, Calif Lip: Renewal 9/30/201.5 NO. nLC JOZOU 1 <br />fr :P167)Et31130Avenida Del Reposo,/Temea, California 9259144 . en,n. . <br />, x77 0 < -- <br /><3 (DF C ALIFL.1Cell/voice (951) 297-0554/ Office/voice (951) 694-6336 <br />E>
The URL can be used to link to this page
Your browser does not support the video tag.