My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
824 N Garfield St - Misc. Permit
PBA
>
Building
>
Permits
>
G
>
Garfield St
>
824 N Garfield St
>
Misc.
>
824 N Garfield St - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 11:24:37 AM
Creation date
7/27/2021 11:23:31 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
824 N Garfield St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
sol-o1 cac 2016 <br />Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMTLY RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the ce(ification sect <br />minimum 11" x 17" size. <br />ion below. A copy of this form shall be attached to each of TWO sets of plans, of <br />ton lan check shall be <br />Project Address:N S l^e +c4 qz70t <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />nn NO to an of h <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />I <br />1 <br />Contractor Company Name: <br />Contractor License Number: <br />? Efl <br />8 EID <br />9 Etr <br />ro EE <br />Sol+ r <br />4 e z-zz <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wade clear access pathways <br />per Section 605.1 1 of the Californaa Fire Code, and is this shown on the roof plan? <br />Will the PV system be anstalled on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the ptane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weaght <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the min jmum 5/16" lag screws be installed wlth a minimum o! 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages ofthe plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage detaals and manufacturer's PV support information.) <br />I certify under penalty of periu under the laws of State of Califo ia that the above is true: <br />Print Name An ld.-Signature <br />YES NO&o <br />Ftr <br />ptr <br />EuEo <br />EN <br />2 <br />3 <br />4 <br />5 <br />6 <br />Phone Number: <br />Email Addressl <br />Rev 8/29/19 <br />a sl2 Date: 9. 2-l . LD LD
The URL can be used to link to this page
Your browser does not support the video tag.