Laserfiche WebLink
Planning & Building Ngenc <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 {M- 19) <br />Santa Ana, CA 92702 <br />(714) 647.s800 <br />www.santa-ana.org <br />slr i' 'ltr-. ltrr <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimurn 1'1 'x 17'size. lf answerinq NO to anv of the ques tions. olan check shall be required. <br />Project Address:926 S SUSAN ST, SANTA ANA, CA 92704 <br />e O,"1 L <br />f t-', I .", *D <br />AUG20Rtf,,! RESTDENTTAL <br />_,,BHOTOVOLTAIC.,, ),-',," CHECKLIST <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO', El tr <br />2 Etrtr <br />trtr <br />El u <br />EItr <br />10 trtr <br />trtr <br />XDtrtr <br />Etrn <br />3 <br />4 <br />5 <br />6 <br />7 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maxamum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />oLq L <br />I <br />9 <br />I certify under alty of perjur <br />Print Name don <br />under the laws of th <br />,zi -t <br />e State of cali ia th <br />Signaturec <br />7t 9 ?ct/ fLC,e7 Z4Phone Number <br />Email Address:e)t a* t.i (oa-dr/, <br />the above is truer <br />*,,SANTA <br />NA,Iffi <br />Rev I!'1q,?{l <br />Date: