Laserfiche WebLink
,,,'SANTA <br />NA <br />tttllNc <br />&Btlt0NC <br />ICI\CI <br />t <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />Proiect Address:o AJ 6( {k <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO,, ,EA <br />2...6a <br />3 ,trtr <br />o )za <br />s. ,za <br />6AJ <br />?..6J <br />8 E]A <br />s. ,4A <br />n4J <br />Are the following applicable to the proposed project? <br />Vvill the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />\Nill the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Vvill the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Vvill the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />\Mll the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Vvill the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag screws be installed with a minimum ol2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty ol pcriury under the laws of the State of Califo <br />Print Name: -AofdUl 6vtq Signature <br />Date:Phone Number: <br />Email Address: <br />Rev: 8/1712015 <br />6 <br />. ca,\ <br />that the above is tiue: <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Centsr Plaza <br />P.O. Box 1988 (M-tg) <br />Santa Ana, CA 92702 <br />(714) 7-5800 <br />www.santa-ana.otg <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum I 1" x 17" size. lf anawerino NO to anv of the questions, olan check shall be required.