My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181240_2510 N. LARCHMONT - Plan
PBA
>
Building
>
Plans
>
L
>
Larchmont Ave
>
2510 N Larchmont Ave
>
10181240_2510 N. LARCHMONT - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 1:15:37 AM
Creation date
10/25/2020 5:22:32 PM
Metadata
Fields
Template:
Plan
Permit Number
10181240
Full Address
2510 N Larchmont Ave
Fully Linked
True
Document Relationships
10181240 - Permit
(Permit - Plan)
Path:
\Building\Permits\L\Larchmont Ave\2510 N Larchmont Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Classic Composition Mounting Instructions <br />Installation Tools Required: tapemeasure, roofing bar,chalkline, studfinder, caulkinggun,sealantcompatible with roofing materials, <br />drill with 7/32" long-style bit, drill or impact gun with 1/2" deep socket. <br />WARNING: Quick Mount PV products are NOT designed forand should NOT be used to anchor fall protection equipment. <br />Locate, choose, and mark centers of rafters to be <br />mounted. Select the courses of shingles where <br />mounts will be placed. <br />. f <br />.... <br />Using drill with 7/32" bit, drill pilot hole into roof <br />and rafter, taking care to drill square to the roof. <br />Do not use mount as a drill guide. Drill should be <br />'long style bit' aka 'aircraft extension bit' to drill a <br />3"deep hole into rafter. <br />14 <br />Carefully liftcompositionroof shinglewith roofing <br />bar, just above placement of mount. Remove nails <br />as required. See "Proper Flashing Placement" on <br />next page. <br />Cleanoffanysawdust, andfill holewithsealant <br />compatible with roofing materials. <br />Insert flashing between 1st and 2nd course. Slide <br />up so top edge of flashing is at least 3/4" higher <br />than the drip edge of the 3rd course and lower <br />flashing edgeisabovethedripedgeof 1stcourse. <br />Mark center for drilling. <br />77 3rd course <br />Slide flashing into position. Prepare hanger bolt <br />with hex nut and sealing washer. Insert into hole <br />and drive hanger bolt until QBIock stops rotating <br />easily. Do NOT over torque. <br />You are now ready for the rack of your <br />choice. Follow all the directions of <br />€ c 'i 2A1' I i f, 16 ja: , L, c, -co- @G.;t:'st-;-i'e <br />module manufacturer. <br />All roofing manufacturers' written <br />instructions must also be followed <br />by anyone modifying a roof system. <br />Pleaseconsulttheroofmanufacturer's <br />specs and instructions prior to <br />touching the roof. <br />Insert EPDM rubber washer over hanger bolt into Using the rack kit hardware, secure the racking <br />block.(bfoot) to the mount using torque specs from - <br />racking manufacturer. If racking manufacturerdoes <br />not specify torque setting, tighten to 13 ft.-lbs.Sep-2013, Rev 6Bl 7.2.3-7
The URL can be used to link to this page
Your browser does not support the video tag.