Laserfiche WebLink
IQSC-3-DSH-00021-5.0-EN-US-2024-08-19 <br />Figure 1B: Installing DER breakers for IQ8 system with generator <br />Hold-down kit screw <br />Generator breaker <br />Use a correctly sized breaker. <br />Hold-down capability integrated <br />with the load center <br />Hold-down kit arm <br />Solar breaker <br />Use a correctly sized breaker. <br />Hold-down capability integrated <br />with the load center <br />Pre-wired red and black wires <br />Connect to storage and solar <br />breakers <br />Pre-wired red and black wires <br />Connect to the generator <br />breaker <br />Storage breaker <br />Use a correctly sized breaker. <br />Hold-down capability <br />integrated with the load center <br />L1 - NFT <br />L1 - IQ Gateway <br />L2 - IQ Gateway <br />L2 - NFT <br />Siemens breaker <br />Eaton breaker <br />NFT and IQ Gateway breaker <br />Factory installed quad breaker <br />(Siemens or Eaton). NFT pre- <br />wired to 40 A terminal of the <br />quad breaker. Connect <br />IQ Gateway L1 and L2 to 20 A L1, <br />L2 terminals of the quad breaker <br />respectively <br />L1 - IQ Gateway <br />L1 - NFT <br />L2 - NFT <br />L2 - IQ Gateway