Laserfiche WebLink
Figure 2: Vertical and horizontal separation of the test configuration <br />NOTE: Some battery units are not drawn to scale. These smaller battery units also represent an <br />IQ Battery 5P unit. <br />The following figure illustrates the top view of the test configuration. <br />Initiator unit <br />wall mount (or <br />target unit) <br />Wall mount <br />(target unit) <br />Wall mount <br />(target unit) <br />Floor mount <br />(target unit) <br />Floor mount <br />(target unit) <br />Figure 3: Top view of the test configuration <br />Ordering the new IQ Battery 5P <br />Some AHJs may require IQ Battery 5P to be tested to the UL 9540A standard without CRDs to allow <br />installation in non-habitable indoor or outdoor locations with reduced spacing. If you are in such a <br />Unit test configuration <br />4 © 2024 Enphase Energy Inc. All rights reserved.August 2024 <br />TEB-00153-2.0-EN