My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
820 N Euclid Street - Plan
PBA
>
Building
>
ProjectDox
>
E
>
Euclid St
>
820 N Euclid St
>
820 N Euclid Street - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 10:58:25 AM
Creation date
10/16/2025 5:00:05 AM
Metadata
Fields
Template:
Plan
Permit Number
20186581
Full Address
820 N Euclid St
Street Number
820
Street Direction
N
Street Name
Euclid
Street Suffix
St
Text box
ID:
1
Creator:
Import Agent
Created:
10/16/2025 5:00 AM
Modified:
10/15/2025 3:51 PM
Text:
https://link.enphase.com/UL9540A-report-summary-IQ-Battery-5p-MRS-3m3
ID:
2
Creator:
Import Agent
Created:
10/16/2025 5:00 AM
Modified:
10/15/2025 3:51 PM
Text:
https://link.enphase.com/UL9540A-report-summary-IQ-Battery-5p-MRS-3m3
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Appendix A <br />UL 9540A report summary for units with new battery module <br />Unit part number: 892-00024 93 or higher, 894-00024 01 or higher, 892-00045 01 or higher, <br />894-00124 01 or higher <br />Module model number: EHE-002 Rev 02 <br />Module part number: 436-00007-02 <br />Report title: UNIT TEST REPORT UL 9540A Test Method for Evaluating Thermal Runaway Fire <br />Propagation in Battery Energy Storage Systems (AACD). <br />Project number: 4790992384 <br />Test date: 09/14/2023 <br />Minimum room size (MRS): 3 m3 <br />For more information, see the UL 9540A report summary of IQ Battery 5P (892-00024 93 and higher) <br />tech brief. <br />UL 9540A report summary for units with new battery module <br />7 © 2024 Enphase Energy Inc. All rights reserved.August 2024 <br />TEB-00153-2.0-EN
The URL can be used to link to this page
Your browser does not support the video tag.