My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181241_2210 N. SPINNAKER - Plan
PBA
>
Building
>
Plans
>
S
>
Spinnaker St
>
2210 N Spinnaker St
>
10181241_2210 N. SPINNAKER - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2021 11:54:08 PM
Creation date
10/25/2020 5:22:32 PM
Metadata
Fields
Template:
Plan
Permit Number
10181241
Full Address
2210 N Spinnaker St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Classic Composition Mounting Instructions <br />Installation Tools Required: tape measure, roofing bar,chalkline,stud finder, caulkinggun, sealantcompatible with roofing materials, <br />drill with 7/32' long-style bit, drill or impact gun with 1/2" deep socket. <br />WARNING: Quick Mount PV products are NOT designed forand should NOT be used to anchor fall protection equipment. <br />1 --3rdcourse-i// <br />/ 2nd course <br />1st course <br />Locate, choose, and mark centers of rafters to be <br />mounted. Select the courses of shingles where <br />mounts will be placed. <br />Using drill with 7/32" bit, drill pilot hole into roof <br />and rafter, taking care to drill square to the roof. <br />Do not use mount as a drill guide. Drill should be <br />'long style bit' aka aircraft extension bit' to drill a <br />3"deep hole into rafter. <br />Insert EPDM_rubber washer over hanger bolt into <br />block. - - - <br />817.2.3-7 <br />Insert flashing between 1 st and 2nd course. Slide <br />up so top edge of flashing is at least 3/4" higher <br />than the drip edge of the 3rd course and lower <br />flashing edge isabove thedripedgeof 1st course. <br />Markcenter fordrilling. <br />/1 3rd course <br />Slide flashing into position. Prepare hangs bolt <br />with hex nut and sealing washer. Insert into hole <br />and drive hanger bolt until QBIock stops rotating <br />easily Do NOT over torque. <br />_Youare now ready for the.rack of your_ <br />choice. Follow all the directions of <br />-the-fackmanutatturer as weii as trie <br />module manufacturer. <br />All roofinq manufacturers' written <br />instructions must also be followed <br />by anyone modifying a roof system. <br />-Pleaseconsulttheroofmanufacturerls- <br />L.specs-Land. instructions..prior_.to_.2 <br />touching the roof. <br />Sep-2013, Rev 6 <br />Carefully lift composition roof shinglewith roofing <br />bar, just above placement of mount. Remove nails <br />as required. See "Proper Flashing Placement" on <br />next page. <br />Cleanoffanysawdust, and fill hole with sealant <br />compatible with roofing materials. <br />Using the rack kit hardware, secure the_racking <br />(L-foot) to the mount using torque specs from <br />racking manufacturer. If racking manufacturerdoes <br />not specify torque setting, tighten to 13 ft.-lbs. <br />6 <br />:-444
The URL can be used to link to this page
Your browser does not support the video tag.