Laserfiche WebLink
,-,'SANTA <br />ANAJIIIil <br />a Plan n ing & Building Agency <br />B uildin g Safety Division <br />20 Civic Center Plaza <br />P.0. Box 1988 (M-19) <br />Santa Ana, C A 92102 <br />(714) 647-s800 <br />w ww. s a nta.an a.or9 <br />DISABLED ACCESS COMPI-IANCE <br />DOCUMENTATION TORM <br />ACC-01 CBC 2019 <br />A. PURP0SE OF THIS D0CUMENTATION: (check one) <br />X finOing ot rnreasonable hardship for projects UNDER the valuation threshold. <br />! Finding of unreasonable hardship for projects OVER the valuation threshold' <br />E Cerlification of Full Compliance with the 20'19 California Building Code <br />' Valuation threshold as defined in the 2019 California Building Code, Section 1 'l 8-202.4 (Exception ,E) and <br />Section 202 is $170.466.00 (as ol January 2020) <br />B. PROJECT INTORMATION TO BE COMPI.ETTD BY PETITIONER: <br />Proi€ct Addross: <br />2010 - 1/2 Ma n St <br />P6mit Numbor: <br />101104316 <br />Project Oescnptjoni <br />Remove porton of intonor non bsaring partitlon <br />Floor Number <br />Business Name / Owner: <br />TBO - Tonant space rs vacant <br />Business Phone Number <br />Legal Properly Owner Phone Number: <br />Total Conslruction Cost or Proj€cl Valuation$ s<.aoo <br />Cost of Providing Complete Disabl6d Access$ $r.ozo <br />1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold <br />based on the valuation of site and building improvemenls for the last three-year period. <br />Permit No Valualion of lm rovemenls <br />2. 20yo of fol3l Construction Cost or Project Valuation: <br />3. The actual amount to be spent to provide disabled access <br />$ $880 <br />$ $1.070 <br />4. Describe the impact of the proposed improvements on financial feasibility of the project. <br />Accessible parking space shall be re-skiped <br />5. Describe the nature of the use of the facility under construction and its availability to persons with <br />disabilities and the nature of accessibility that would be gained or lost: <br />Building will be vacanl during conslruclon. <br />Page 1 of 2 <br />Total: <br />lssuance Date <br />Rev 02104t2024