Laserfiche WebLink
CS*=R -5 2 <br />STRUCTURAL ENGINEERS <br />April 15, 2014 <br />Mounting System <br />820 Riverside Pkwy <br />Sacramento, California 95606 <br />TEL: (855) 731-9996 <br />FAX: (916) 287-2269 <br />Attn.: Mounting System - Engineering Department, <br />Re: Engineering Certification for the Mounting System 13/52 Rail Span Chart <br />PZSE, Inc.-Structural Engineers has reviewed Mounting System's 13/52 rail span charts. All information, <br />data and analysis contained within the Mounting System 13/52 rail span charts are based on, and comply <br />with the following: <br />1. Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-10 <br />2. 2012 International Building Code, by International Code Council, Inc. <br />3. 2013 California Building Code, by California Building Standards Commission <br />4. 2010 Aluminum Design Manual, by The Aluminum Association <br />5. AC428, Acceptance Criteria for Modular Framing Systems Used to Support <br />Photovoltaic (PV) Panels, November 1, 2012 by ICC-ES <br />This letter certifies that the loading criteria and design basis for the Mounting System 13/52 rail span <br />charts are in compliance with the above Codes. <br />If you have any questions on the above, do not hesitate to call.€=5*27.- <br />Sincerely <br />,-ake *E#*HE TH <br />25'41 <br />rr,3 <br />Z No. S3878 <br />"i* /• k Ezo. 341-15 *,1 <br />- 11 10 , <br />Paul Zacher, SE - President <br />M..94414@De.,0 +t:%2=dus>f <br />8137 Sunset Avenue, Suite 120 • Fair Oaks, CA 95628 • 916.961.3960 • 916.961.3965 f • www.Pl51.COM <br />e