My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2310 N Spurgeon St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Spurgeon St
>
2310 N Spurgeon St
>
2310 N Spurgeon St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 4:09:29 AM
Creation date
10/23/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20187009
101125194
Full Address
2310 N Spurgeon St
Street Number
2310
Street Direction
N
Street Name
Spurgeon
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />Planning and Building Agency <br />untertek York, Rennsylvania4pproved <br />130 Derry Qourt <br />Total Quality. Assured. Telepho <br />e: FiQ&V" M IT ISSUANCE <br />Facsim <br />le: 717-764-4129 <br />www.int2rtek.com/building <br />TEST REPORT FOR UNIRAC, INC. <br />Report No.: K1190.01-109-44 <br />Master ID: <br />Date: 09/19/19 <br />Date: <br />TEST METHOD(S) <br />The specimens were evaluated in accordance with the following: <br />U L 441 Eleventh Edition dated August 28, 2019, UL Standard for Safety for Gas Vents, Section <br />27: Rain Test <br />MATERIAL SOURCE/INSTALLATION <br />Test specimens were provided by the client. Representative samples of the test specimen(s) will <br />be retained by Intertek B&C for a minimum of four years from the test completion date. <br />Test Specimens #1 and #2 Deck Construction: The test deck measured 3' wide by 3' high and was <br />constructed of #2 Spruce -Pine -Fir nominal 2x6 lumber. One stud was centered on the deck for <br />bolt attachment. Studs were attached to the top and bottom plates with 3" long drywall screws. <br />A sheet of nominal 1/2" thick plywood was secured to the studs with #8 x 1-5/8" drywall screws. <br />Silicone was utilized on the backside of the test panel to seal the perimeter. The test deck was <br />then covered with #30 felt paper and asphalt shingles. <br />Test Specimen #3 and #4 Deck Construction: The test deck measured 3' wide by 3' high and was <br />constructed of #2 Spruce -Pine -Fir nominal 2x6 lumber. One stud was centered on the deck for <br />bolt attachment. Studs were attached to the top and bottom plates with 3" long drywall screws. <br />A sheet of nominal 1/2" thick plywood was secured to the studs with #8 x 1-5/8" drywall screws. <br />Silicone was utilized on the backside of the test panel to seal the perimeter. The test deck was <br />then covered with torch applied roof membrane. <br />Test Specimen Installation: Each specimen was centered on a 2x6 stud and was secured with a <br />5/16" x 4" hex head lag bolt with a stainless steel -back EPDM washer through the Flashloc Comp <br />Mount into the stud. The Flashloc Comp Mounts were completely filled with sealant. Test <br />Specimens #1 and #3 utilized DuraLinkTm 50 sealant. Test Specimens #2 and #4 utilized M-11 <br />sealant. The sealant was allowed to cure for 24 hours. <br />Version: 07/24/17 Page 3 of 15 RT-R-AMER-Test-2805 <br />
The URL can be used to link to this page
Your browser does not support the video tag.