My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181553_1859 RED FOX - Plan
PBA
>
Building
>
Plans
>
R
>
Red Fox Rd
>
1859 W Red Fox Rd
>
10181553_1859 RED FOX - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2021 12:52:43 AM
Creation date
10/25/2020 5:22:43 PM
Metadata
Fields
Template:
Plan
Permit Number
10181553
Full Address
1859 W Red Fox Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOLARMOUNT <br />Top Mounting UniRac Grounding Clips and WEEBLugs - 225.6 <br />UGC-1 <br />.t <br />P TOP. 9 <br />mounting A,j <br />clamps <br />. A- A..'- <br />hzA Nib Ci. 1 Vus <br />Intertek <br />Conforms to <br />UL Standard 467 <br />T-bolt 1 <br />JGC- 1 54-=1 4 <br />F <br />.. <br />Figure 26. Slide UGC-1 grounding <br />clip into top mounting slot of rail. <br />Torque modules in place on top of <br />clip. Nibs will penetrate rail anod- <br />izationandcreategroundingpath <br />through rail (see Fig. 3, reverse side) <br />SolarMount® rail (any type) <br />WEEBLug <br />Stainless Steel Flat <br />Wncher (WFFRI <br />Olip: and lue, e•n •r,1,1 capiriveli <br />Figure 27.Insert a bolt in the <br />aluminum rail or through the <br />clearance hole in the stainless steel <br />flat washer. Place the stainless steel <br />flatwasheron the bolt, oriented <br />so the dimples will contact the <br />Wumhtum rail. Jllaro Hi, 111.Inrl:,/Ill <br />on f/12 MIr und sluln!215 3lecljlut <br />was}wr, Install stainless steelildf <br />wubliti, lu-k biddhap and nut, <br />Tight.n rh, nur until the dimple# are <br />miripletflv zmhcddcd into the rail <br />and lug 77'e embedded dimples make <br />a gas-tight mechanical connection <br />and ensure good elect/·ical connection <br />between the aluminum rail djld r/le <br />lug through the WEER. <br />el <br />WEEP' 110 <br />51&un-t® rail <br />(any type) <br />Figure 28. UGC-1 layoutfor even <br />and odd number of modules in row. <br />9(" denotes places to install UGC-1. <br />Even Number 0/Modules in row <br />A - <br />- 1 1 - <br />C= <br />Odd Number ofModules in row <br />:F UNI RAC <br />A HILTI GROUP COMPANY <br />Pub 110617-2cc <br />June 2011 <br />© 2011 by Unirac, Inc. <br />All rights reserved.
The URL can be used to link to this page
Your browser does not support the video tag.