QBase Universal Tile Mount I QMUTM QBase Universal Tile Mounting Instructions
<br />Subflashing Waterproofing Method: Lapped Paper
<br />Installation Tools Required: tape measure, drill with 7/32" bit, drill or impact gun with 1/2" deep socket, caulking gun and sealant
<br />DESCRIPTION QTY.NO.Nt JMBFR compatible with roofing material, 30 Ib felt paper, whisk broom, roofing bar, angle grinder with a diamond blade
<br />1 2201 CAP SCREW, HEX HEAD, 5/16"-18 X 3/4" UNC-2A, GRADE 8 1
<br />2 1110 QBASE, 1-1/4" ID, FOR 5/16" HARDWARE. A360.1 CAST AL 1 WARNING: Quick Mount PV products are NOT designed and should NOT be used to anchor fall protection equipment.
<br />3 2309 LAG SCREW, HEX HEAD, 5/16" X 3% ZINC 2
<br />4 1501 SUBFLASHING, SPUN CONE. QBASE, 9'*9'1.020". 3003 AL MILL
<br />5 1310 FL ASHING, SPUN CONE, 18"X 18"X.032", 3003 AL. MILL
<br />6 2990 COLLAR, COUNTER FLASHING. 1-1/4" ID EPDM
<br />7 5316 POST, 1.25" OD X 6.5", 6063-T5, MILL
<br />8 2104 WASHER, SEALING, 5/16" ID X 1-1/4"OD. EPDM BONDED SS
<br />9 2101 WASHER, FENDER, 5/16" ID X 1" OD, 18-8 SS
<br />10 2108 WASHER. SPLIT-LOCK, 5/16" ID, 18-8 SS
<br />11 2203 CAP SCREW, HEX HEAD, 5/16'118 X 1" UNC-2A, 18-8 SS
<br />;,?AL
<br />1,an*.An i
<br />77739 1
<br />1 Ch
<br />1
<br />1
<br />1 I 1
<br />1
<br />1
<br />1
<br />Remove tile at selected location of mount.Locate and mark center of rafter. Clean felt paper Use a straight edge and measure up 6 5/8" from bob
<br />i with hand broom.tom of tiles to center of the mount overthe center
<br />1 of rafter.
<br />AVAILABLE IN MILL, CLEAR ANODIZED,
<br />AND BRONZE ANODIZED FINISHES.
<br />STAINLESS STEEL LAG SCREWS
<br />INCLUDED WITH ANODIZED FINISHES.
<br />Quick Mount PV
<br />TITLE:
<br />QMUTM: QBASE UNIVERSAL TILE
<br />MOUNT
<br />nOMIETAR, AND CONFIDENT,At:*--m:NRA'-.-m;62.4,2-9.'r7%0:A@..OUNIPV. AN,REPROOUCâ„¢,NPARTORAS
<br />UNLESS OTHERWISE SPECIFIED:
<br />DIMENSIONS ARE IN INCHES
<br />TOLERANCES:
<br />- FRACTIONAL: 1/8
<br />DO NOT SCALE DRAWING 'IWO PLACE DECIMAL 1.18
<br />THREEPLACE DECIMAL :.125
<br />4
<br /> SIZE DRAWN BY: RAD ' REV
<br />i A [ UTE: 101 1/20-G i 6
<br />SCALE: l:8 |WaGHT: 2.26 SHEET I OF 2
<br />5 4 3
<br />Ultimate Load Capacity
<br />2 1
<br />t
<br />Align QBase (item 1) over rafter center and drill
<br />two %2" pilot holes. Fill pilot holes with seal-
<br />ant compatible with roofing material. Place
<br />grade-8 cap screw (item 2) under QBase in hex
<br />slot, threads pointing up. Lag QBase into rafter
<br />through pilot holes.
<br />Install subflashing (item 5) in either the lapped
<br />paper method explained on this page or the three-
<br />course method explained on the next page.
<br />Take care to do a quality installation. When using
<br />the paper method, slide subflashing under felt
<br />overlap orcut an additional piece of felt paper 18"
<br />wideto slide underthe course above, and over the
<br />primary flashing of the mount.This is essential for
<br />properwaterproofing.
<br />Average values based on failure tests results in Douglas Fir
<br />Test Setup
<br />Source: AME Report 111316C, 7/5/2011
<br />Please note:
<br />1)The ultimate load is NOT thesameas allowable load. Ultimate load isthe load atthe pointof failure. Since pointof failure isusually heavilydependenton the roof itself, allowable load
<br />should be calculated by the responsible engineer using the appropriate factor of safety for that job.
<br />2) Thread must be embedded in a rafterorotherstructural roof member.
<br />3) See IBC for required edge distances.
<br />Ultimate Load Capacity [lbf]Rafter moisture content (96)Rafter specific gravity Failure Mode
<br />You are now ready for the rack of
<br />Pullout 3031 20.9 0.436 Lag Bolt Pulled Out yourchoice. Follow all the directions
<br />Shear Parallel to Rafter 803 13.8 0.438 Lag Bok Pulled Out of the rack manufacturer as well as
<br />Shear Perpendicular to Rafter 583 16.5 0.451 Plywood buckled/ Lag the module manufacturer.
<br />Bolt Pulled Out
<br />All roofing manufacturers' written
<br />instructions must also be followed
<br />by anyone modifying a roof system.
<br />Please consult the roof manufactur-
<br />er's specs and instructions prior to
<br />touching the roof.
<br />uick Mount Py
<br />RESPECT THE ROOF
<br />With a diamond blade on a grinder or skill-saw,
<br />cut tile to allow post to pass through. Place cut tile
<br />back in position. Insert post (item 3) and tighten
<br />into place.
<br />Install the 18"x 18" flashing (item 6). Pre-bend the
<br />flashing to follow the contour of the tile if curved.
<br />Apply sealant where post and flashing meet, and
<br />install EPDM counter flashing collar (item 7). Be
<br />sure to seal off the post from weather exposure
<br />with the racking hardware (items 8-11) in the in-
<br />terim before racks are installed.
<br />B17.2.3-4 Oct-2013, Rev 6Bl 7.2.3-4 Oct-2013, Rev 6
<br />1 of 4 2 of 4
|