My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181747_3357 S. BRISTOL - Plan
PBA
>
Building
>
Plans
>
B
>
Bristol St
>
3357 S Bristol St
>
10181747_3357 S. BRISTOL - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 12:08:00 AM
Creation date
10/25/2020 5:22:47 PM
Metadata
Fields
Template:
Plan
Permit Number
10181747
Full Address
3357 S Bristol St
Fully Linked
True
Document Relationships
10181747 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Bristol St\3357 S Bristol St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IE LED Channel Installation direction <br />Tools & Supplies <br />Wire Stripper, Drill, Screw Driver, Tower, Wire nuts, <br />Nippers, Insulating tape, Compression Tube, Connection <br />cable to power, Bushing. <br />(Option: Slilicon and Screws) <br />Materials <br />* LED Modules: ECO Series Modules <br />* Channel Letter Height : 80-120mm <br />* Recommended cover materials: <br />Light diffusion PC (Polycarbonate) or <br />Acrylic exclusive for LED <br />* Recommended paint color inside channel letter <br />: White color for better reflection of LED lights <br />1. Clean the moisture,dust and oil inside the channel letter and <br />check if there is scratch or breakage. <br />Adhesive tape will be taken off easily in case products is mounted on <br />dirty and uneven surfaces. <br />2. Using predetermined layout, place LED modules with adhesive <br />tape on the backside of modules. Make sure that modules are firmly <br />attached on the surface. <br /> Do not press down directly on the top of LED lamp to avoid any damages. <br />3. Make holes using drill, one for wiring on the backside of channel <br />letter, another one for water drain on downside. Use bushing to <br /> protect wires from an electric leakage. <br />4. To fix modules permanently, spread silicon on the side of modules <br />5. Do wire between LED modules and power supply(SMPS) <br />minimizing the wire length. ( Above 5meter wiring, need consulting) <br />6. Cap all strand of modules using wire nut or compression tube, <br />silicon for waterproofing. <br />7. Power on the power supply(SMPS) and do lighting test. <br />N 8. If lighting has no problem, cover the channel letter and check the <br />exterior. <br />N'10 WES•soiq Head office : 4F, Daedeak B/D, 513-32 Amsa-dong, Kangdong-gu, Seoul, Korea <br />Factory : 16-5, Kakok-Ii, Hwuado-eup, Namyangju-si, KyungKi-Do, Korea <br />Website : www.ncled.co.kr Email to safesi @ncred.co.* <br />ay.» • Mvt' ' .**»92 '1 96" 0· '.©t "6.«.
The URL can be used to link to this page
Your browser does not support the video tag.