Laserfiche WebLink
Prepared for: <br />Project: <br />Date: <br />SST Project (TID): <br />Arrow Truss <br />23656 - Hernandez Jr ADU & ADU <br />7/17/2025 10:05 AM <br />280459 <br />COMPONENT DESIGN DRAWINGS & DETAILS <br />Simpson Strong-Tie <br />Company, Inc. <br />5956 W. Las Positas Blvd. <br />Pleasanton, CA 94588 <br />(800) 999-5099 <br />www.strongtie.com <br /> Notes: <br /> 1. The component design drawings referenced below have been prepared based on design criteria and requirements set forth in the <br /> Construction Documents, as communicated by the Component Manufacturer. <br /> 2. The engineer's signature on these drawings indicates professional engineering responsibility solely for the individual components <br /> to be able to resist the design loads indicated, utilizing all the design parameter and materials indicated or referenced on each <br /> individual design. <br /> 3. It is the Building Designer's responsibility to review the component design drawings to insure compatibility with the Building design, <br /> Refer to all notes on the individual component design drawings. <br /> 9 Component Design Drawing(s): <br />1 1-A1: SID 3668807 4-A4: SID 3668810 7-A5B: SID 3668813 <br />2 2-A2: SID 3668808 5-A5: SID 3668811 8-A6: SID 3668814 <br />3 3-A3: SID 3668809 6-A5A: SID 3668812 9-J1: SID 3668815 <br />Project location has not been provided.Project Location: