My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
712 S Bristol St - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bristol St
>
712 S Bristol St
>
712 S Bristol St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 10:30:11 AM
Creation date
11/12/2025 5:00:03 AM
Metadata
Fields
Template:
Plan
Permit Number
101125075
Full Address
712 S Bristol St
Street Number
712
Street Direction
S
Street Name
Bristol
Street Suffix
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLAN VIEW <br />SCALE 1/45 <br />PLAN EAST VIEW <br />SCALE 1/45 <br />ISOMETRIC VIEW <br />SCALE 1/85 <br />FOUNDATION DETAIL <br />SCALE 1 / 20 <br />Skyways <br />by Landscape Structures Inc. <br />8131 Forney Rd. <br />Dallas TX, 75227 <br />playlsi.com <br />Date: <br />Drawn by: <br />Designed by: <br />Approved by: <br />Drawing: <br />Sheet No.: <br />12/6/24 <br />TM <br />DG <br />A For Approval 12/6/24 <br />TM <br />400-2025-173 SO-01018878 CP041047 <br />DG <br />Hypar Sail <br />SO-01018878 <br />Bristol Tolliver Park <br />712 S Bristol St. <br />Santa Ana, CA, 92703 <br />Project No. <br />Sheet title <br />Sheet Size: <br />Reference Scale: <br />1"1/2"1/2"1/2" <br />#Revision Date By <br />Stamp: <br />Project Info.: <br />'D' 34"x22" <br />2 <br />Revisions <br />Plans & Sections <br />N <br />Plan <br />1 2 <br />B <br />A <br />3 <br />3" COVER <br />C <br />4 <br />1'-7" SQ <br />Anchor Assembly 1 1/2" x 36" ANCH-1500-36-001 <br />BPL-1500-A57-STD4-001 <br />30" MINIMUM ANCHOR EMBED <br />#4 STIRUPS <br />TOP 4 @ 3" O.C. <br />FOLLOWED BY 4 @ 6" O.C. <br />FOLLOWED BY OTHER STIRRUPS AT 12" O.C. MAX <br />ALL STIRRUPS 12" MIN OVERLAP <br />FFE <br />TOF <br />SG <br />9" HOLD <br />4" SURFACING <br />1 1/2" BASEPLATE 1 1/2" LEVELING BED <br />11'-6" <br />4" SURFACING4" SURFACING <br />18'-0" <br />19'-9 5/8" <br />12'-0" <br />13'-9 5/8" <br />18'-0" <br />19'-9 5/8" <br />18'-0" <br />19'-9 5/8" <br />12'-0"12'-0" <br />13'-9 5/8" <br />18'-0" <br />19'-9 5/8" <br />4321 <br />C <br />B <br />A <br />26'-5 1/2" <br />41'-4 3/8" <br />12'-7"17'-1 1/16"11'-8 3/8" <br />24'-2 1/16" <br />2'-3 3/8" <br />26'-10 1/4" <br />28'-9 7/16" <br />29'-3 9/16" <br />29'-9 1/16" <br />COLUMN n12 3/4" X 0.375" WALL <br />COLUMN n12 3/4" X 0.375" WALL <br />COLUMN n10 3/4" X 0.375" WALL <br />COLUMN n10 3/4" X 0.375" WALL <br />FFE <br />SG <br />FFE <br />SG <br />3'-0" <br />(12) #8 VERT BARS <br />EQ DISTRIBUTED AROUND <br />PERIMETER OF PIER. <br />MAINTAIN 3" CONC COVER. <br />PROVIDE STD 90 DEGREE HOOK <br />AT TOP OF ALTERNATING BARS. <br />N <br />Plan n3'-0" <br />n2'-6" REBAR RING <br />1'-1" SQ <br />GROUT OR CONCRETE CAP TO BE INSTALLED <br />AFTER COLUMN INSTALLATION IN ORDER TO <br />PREVENT RUST ACCUMULATION. <br />REFERENCE GENERAL NOTES FOR <br />GROUT LEVELING BED REQUIREMENTS. <br />GROUT LEVELING BED IS REQUIRED AND <br />SHALL FULLY FILL VOID BETWEEN <br />BOTTOM OF BASEPLATE & TOP OF PIER. <br />(1/4) <br />3/8 <br />AMMTEC CONSULTANTS FOR <br />Oct 22, 2025
The URL can be used to link to this page
Your browser does not support the video tag.