Laserfiche WebLink
www.hilti.com <br />Hilti PROFIS Engineering 3.1.19 <br />Input data and results must be checked for conformity with the existing conditions and for plausibility! <br />PROFIS Engineering ( c ) 2003-2025 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan <br />2 <br />Company: <br />Address: <br />Phone I Fax: <br />Design: <br />Fastening point: <br />Landscape Structures Inc. <br />8131 Forney Rd. <br /> | <br />CP042041 STD-7 16 Rev 2 <br />Page: <br />Specifier: <br />E-Mail: <br />Date: <br />2 <br />felipepena@playlsi.com <br />8/11/2025 <br />1.1 Design results <br />Case Description Forces [kip] / Moments [ft.kip]Seismic Max. Util. Anchor [%] <br />1 Combination 1 N = -5.610; Vx = 6.037; Vy = 11.552; <br />Mx = -198.12000; My = 123.26000; Mz = 0.00000; <br />no 65 <br />2 Load case/Resulting anchor forces <br />Anchor reactions [kip] <br />Tension force: (+Tension, -Compression) <br />Anchor Tension force Shear force Shear force x Shear force y <br />1 0.345 1.629 0.755 1.444 <br />2 0.000 1.629 0.755 1.444 <br />3 0.000 1.629 0.755 1.444 <br />4 8.459 1.629 0.755 1.444 <br />5 29.811 1.629 0.755 1.444 <br />6 42.533 1.629 0.755 1.444 <br />7 39.172 1.629 0.755 1.444 <br />8 21.697 1.629 0.755 1.444 <br />Max. concrete compressive strain: 0.49 [‰] <br />Max. concrete compressive stress: 2,148 [psi] <br />Resulting tension force in (x/y)=(-4.240/-6.642): 142.016 [kip] <br />Resulting compression force in (x/y)=(5.940/9.715): 147.626 [kip] <br /> Anchor forces are calculated based on the assumption of a rigid anchor plate. <br />3 Tension load <br />Load Nua [kip]Capacity f Nn [kip]Utilization bN = Nua/f Nn Status <br /> Steel Strength*42.533 79.312 54 OK <br /> Pullout Strength*42.533 65.948 65 OK <br /> Concrete Breakout Failure**1 N/A N/A N/A N/A <br /> Concrete Side-Face Blowout, direction y-*39.172 97.668 41 OK <br /> * highest loaded anchor **anchor group (anchors in tension) <br />1 Tension Anchor Reinforcement has been selected! <br />THESE LOADS ARE THE <br />SUPPORT FORCES ON <br />NODE 10