Laserfiche WebLink
SUBJECT:Bristol Tolliver Park <br />Member Calculations <br />Typ. Aluminum Post B <br />SHEET NO:MC2 - <br />PROJECT NO: 11250537 <br />BY:MAM DATE: 09/05/2025 <br />1 <br />PlayBooster Aluminum Post Analysis: <br />Wind Analysis: <br />Wind Loading: (Sheet LD1-2) <br />≔pw1 ⋅16 psf (Panels) <br />≔pw2 ⋅16 psf (Round Post) <br />Wind Load Area: <br />≔Aw1 =+⋅⋅⋅24 in 55 in ⋅⋅⋅8 in 38 in 11.28 ft2 (Rush Slide) <br />≔Aw2 =⋅⋅⋅2.375 in 120 in 1.98 ft2 (SwiggleKnots Bridge) <br />≔Aw3 =⋅⋅⋅5 in 98 in 3.4 ft2 (Post) <br />Wind Force: <br />≔Fw1 =⋅pw1 Aw1 0.18 kip <br />≔Fw2 =⋅pw2 Aw2 0.032 kip <br />≔Fw3 =⋅pw2 Aw3 0.054 kip <br />Location: (first 14" are buried plus two feet due to soil) <br />≔Hw1 =++⋅14 in ⋅24 in ⋅66 in 104 in (Rush Slide) <br />≔Hw2 =++⋅14 in ⋅24 in ⋅92 in 130 in (SwiggleKnots Bridge) <br />≔Hw3 =++⋅14 in ⋅24 in ⋅98 in 136 in (Post) <br />Moment: <br />Number of Posts, ≔nw1 2 ≔Mw1 =――――⋅⎛⎝Fw1⎞⎠Hw1 <br />nw1 <br />9.38 ⋅kip in <br />Number of Posts, ≔nw2 2 ≔Mw2 =――――⋅⎛⎝Fw2⎞⎠Hw2 <br />nw2 <br />2.06 ⋅kip in <br />Number of Posts, ≔nw3 1 ≔Mw3 =――――⋅⎛⎝Fw3⎞⎠Hw3 <br />nw3 <br />7.4 ⋅kip in <br />≔MWtot =++Mw1 Mw2 Mw3 18.85 ⋅kip in