Laserfiche WebLink
SUBJECT:Bristol Tolliver Park <br />Member Calculations <br />Typ. Steel Post D <br />SHEET NO:MC4 - <br />PROJECT NO: 11250537 <br />BY:MAM DATE: 09/05/2025 <br />4 <br />Wind and Seismic Moments (ASD): <br />Wind:≔Mwa =⋅0.6 MWtot 15.94 ⋅kip in <br />Seismic:≔MEa =⋅0.7 MEtot 10.8 ⋅kip in <br />Controlling =Load “Wind”Use for design checks <br />=Mu 15.94 ⋅kip in <br />Reaction (ASD): <br />≔RT =⋅0.6 <br />⎛ <br />⎜ <br />⎜⎝ <br />++++――Fw1 <br />nw1 <br />――Fw2 <br />nw2 <br />――Fw3 <br />nw3 <br />――Fw4 <br />nw4 <br />――Fw5 <br />nw5 <br />⎞ <br />⎟ <br />⎟⎠ <br />0.186 kip