Laserfiche WebLink
7. Identify the accessibility features and equivalent facilities that WILL be brought into compliance with <br />the latest edition of Title 24 as a part of this project and an estimate of the cost of each item:(Documentation may be required) <br />Accessible Features to be Made Accessible Cost of Improvement <br />a. Entrance: <br />E Ramp O Door j Landing m Stair/Steps $750.00 <br />b. Path of Travel: <br />El Path of travel from building entrance to the area of remodel $ <br />J Path of travel from the public way to the building entrance $ <br />¤ Path of travel from accessible parking to the building entrance $ <br />O Path of travel to sanitary facilities / public phone / drinking fountain $ <br />c. Sanitary facilities ( Floor no. ) $ <br />d. Public phone(s) $ <br />e. Drinking fountain(s) $ <br />f. Parking $ <br />g. Signage <br />h. Alarms $ <br />i. Other $ <br />Total: $750.00 <br />8. Identify the accessibility features that WILL NOT comply if a request for unreasonable hardship is <br />granted. Provide an estimated cost of compliance for each item:(Documentation may be required) <br />Accessible Features Not to be Improved Cost of Improvement <br />a. None. $-- <br />b. $ <br />C. $ <br />i Total: $ - - <br />9. Petitioner must be the legal property owner or his/her legal representative: <br />I certify that the above noted information is true and correct. <br />® Legal Property Owner O Architect/Engineer m Contractor £ Other <br />Print Name: D&S Investment, LLC Phone No.714-366-7156 <br />Adcll,9,Alil_S · Harbor Blvd., #D, Santa Ana, CA 92704 <br />Signature:Date: 10/25/2013 <br />FOR AGENCY USE ONLY <br />Approved by:Date: <br />Rev: 1/3/2012 Page 2 of 2 <br />A <br />a <br />.. r. <br />62 +