My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2502 S Artesia St - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Artesia St
>
2502 S Artesia St
>
2502 S Artesia St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2025 5:00:12 AM
Creation date
11/15/2025 5:00:08 AM
Metadata
Fields
Template:
Plan
Permit Number
20186779
101124849
Full Address
2502 S Artesia St
Street Number
2502
Street Direction
S
Street Name
Artesia
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AR-01 <br />Roofing Material Roof Pitch Hardware Results Structural Results <br />Comp Shingle 18°Pass Pass <br />Hardware Calculations <br />Attachment Information <br />Attachment:UltraFoot Uplift Force: 0.6(p - (3psf x cos(pitch))) x trib area =627 lb Uplift Capacity: 1325 lb a = 5.7 ft <br />Wind Design Criteria (Partially/Fully Enclosed Method, ASCE 7-16) <br />Basic Wind Speed V 96 mph Wind Speed - Category II <br />Wind Pressure Exposure Kz 0.57 Table 26.10-1 <br />Topographic Factor Kzt 1.0 Figure 26.8-1 <br />Wind Directionality Factor Kd 0.85 Table 26.6-1 <br />Ground Elevation Factor Ke 1.00 Section 26.9 <br />Velocity Pressure qh = 0.00256 x Kz x Kzt x Kd x Ke x V²11.41 psf Equation 26.10-1 <br />Solar Adjustment Factors γe (Port/Land) =1.2 γa =0.535 Figure 29.4-8 <br />Wind Pressures Zone 1 (up)Zone 2 (up)Zone 3 (up)Down <br />Ext Pressure Coefficient GCp -1.95 -2.54 -3.02 0.57 Figures 30.3-2(A-H) <br />Ultimate Design Wind Pressure p = qh x GCp x γe x γa -16.00 psf -16.00 psf -18.45 psf 16.00 psf Equation 29.4-7 <br />Mod Orientation X-Spacing Cantilever Trib Area Demand DCR Final Result <br />Landscape 72''28''11.2 ft²11.9 psf 47%Pass <br />Portrait 72''27''17 ft²11.9 psf 38%Pass <br />Structural Calculations <br />Gravity Loading Summary <br />Load Definitions Initial Pre-PV Load Code Factors Post-PV LoadPg =0 psf | Pf =0.7 x Ce x Ct x Pg Ps = Cs x Pf <br />Roof Dead Load (D)DL 10.0 psf 10.0 psf 10.0 psf <br />PV Dead Load (D)PV DL 3.0 psf 0.0 psf 3.0 psf <br />Roof Live Load (Lr)RLL 20.0 psf 20.0 psf 1.00 0.0 psf <br />Sloped Snow Load (Pf --> Ps)LL/SL 0.0 psf 0.0 psf 1.00 0.87 0.0 psf <br />Total Design Load 30.0 psf 13.0 psf <br />Cd Factor of Governing LC 1.25 (D+Lr)0.9 (D) <br />Total Design Load (Normalized)24.0 psf 14.4 psf <br />IEBC 5% Check <br />Net Design Gravity Loading Change (Normalized w/ Cd Factor)-9.6 psf DCR: 60%Pass <br />AR-02 <br />Roofing Material Roof Pitch Hardware Results Structural Results <br />Comp Shingle 18°Pass Pass <br />Hardware Calculations <br />Attachment Information <br />Attachment:UltraFoot Uplift Force: 0.6(p - (3psf x cos(pitch))) x trib area =627 lb Uplift Capacity: 1325 lb a = 5.7 ft <br />Wind Design Criteria (Partially/Fully Enclosed Method, ASCE 7-16) <br />Basic Wind Speed V 96 mph Wind Speed - Category II <br />Wind Pressure Exposure Kz 0.57 Table 26.10-1 <br />Topographic Factor Kzt 1.0 Figure 26.8-1 <br />Wind DIrectionality Factor Kd 0.85 Table 26.6-1 <br />Ground Elevation Factor Ke 1.00 Section 26.9 <br />Velocity Pressure qh = 0.00256 x Kz x Kzt x Kd x Ke x V²11.41 psf Equation 26.10-1 <br />Solar Adjustment Factors γe (Port/Land) =1.2 γa =0.535 Figure 29.4-8 <br />Wind Pressures Zone 1 (up)Zone 2 (up)Zone 3 (up)Down <br />Ext Pressure Coefficient GCp -1.95 -2.54 -3.02 0.57 Figures 30.3-2(A-H) <br />Ultimate Design Wind Pressure p = qh x GCp x γe x γa -16.00 psf -16.00 psf -18.45 psf 16.00 psf Equation 29.4-7 <br />Mod Orientation X-Spacing Cantilever Trib Area Demand DCR Final Result <br />Landscape 72''28''11.2 ft²11.9 psf 47%Pass <br />Portrait 72''27''17 ft²11.9 psf 38%Pass <br />Structural Calculations <br />Gravity Loading Summary <br />Load Definitions Initial Pre-PV Load Code Factors Post-PV LoadPg =0 psf | Pf =0.7 x Ce x Ct x Pg Ps = Cs x Pf <br />Roof Dead Load (D)DL 10 psf 10.0 psf 10.0 psf <br />PV Dead Load (D)PV DL 3 psf 0.0 psf 3.0 psf <br />Roof Live Load (Lr)RLL 20 psf 20.0 psf 1.00 0.0 psf <br />Sloped Snow Load (Pf --> Ps)LL/SL 0 psf 0.0 psf 1.00 0.87 0.0 psf <br />Total Design Load 30.0 psf 13.0 psf <br />Cd Factor of Governing LC 1.25 (D+Lr)0.9 (D) <br />Total Design Load (Normalized)24.0 psf 14.4 psf <br />IEBC 5% Check <br />Net Design Gravity Loading Change (Normalized w/ Cd Factor)-9.6 psf DCR: 60%Pass
The URL can be used to link to this page
Your browser does not support the video tag.