My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20164298 - Permit
PBA
>
Building
>
Permits
>
O
>
Olive St
>
3621 S Olive St
>
20164298 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 9:02:17 AM
Creation date
7/28/2021 9:02:16 AM
Metadata
Fields
Template:
Permit
Permit Number
20164298
Full Address
3621 S Olive St
Permit ID
234700
Master ID Number
2017-139020
Project Name
Miscellaneous Counter1 Permit
Street Number
003621
Street Direction
S
Street Name
Olive
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
9/29/2017
Issued Date
9/29/2017
Finalized Date
10/16/2017
Flood Zone
X-0602320259J
Description of Work
Install new 3.90 kw roof mounted solar PV system (13 panels) ALL FEES PAID ON 10194337
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />EXPEDITED PERMIT PRoCESS FoR SMALL-SCALE PV SYSTEMS <br />MICRO-INVERTER <br />The informalon in this guideline is intended ro help local jurisdictions and conrractors idenify when PV sysrem insallations <br />are simple. needing only a basic review and when an installation is more complex. Ir is likely that 50% -75% of all residenrial <br />systems will comply with these simple criteria. For projecrs that fail ro meet the simple criteria. resolurion steps have been <br />suggested to provide as a path ro permir approval. <br />Reqdreal Inforfiation fot Pefinit: <br />1. Site plan showing locarion of maJor components on rhe properry. This drawing need nor be exacrly ro scale. bur ir <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />wirh a 3'perimeter space at ridge and sides may not need separale hre service review. <br />2. Electrical diagram showing PV array confrguration, wiring system. overcurrenr protecrion, inverter, disconnects, <br />required signs. and ac connecrion ro building (see supplied standard elecrrical diagram). <br />3. Speci6cation sheets and installation manuals (iF available) for all manufacrured componenrs including, bur nor <br />limited to, PV modules, inverter(s), combiner box. disconnects, and mounring sysrem. <br />Step 1 : Structural Review of PV Aray Mounting System <br />Is the array to be mounted on a de6ned, permitted rcof structure? EyesEno <br />lJ No due to non-compliant rooJ ot a ground mounl submit completed wotksheet Jor the structure WKSI . <br />Roof lr{oflnatiofl: <br />l. ls the roohng type lightweight (Yes = composirion, Iighrweighr masonry meral, erc. .)Yes <br />IJ No, submit completed worksheet for roof structure WKSI (No = heayy masonry, slate, etc. ..) <br />2. Does the roof have a single roof coveringz Eyes EUo <br />f No, submit completed worhsheet Jor roof sfiucture WKS I . <br />3. Provide merhod and rype of weatherproohng roof penerrarions (e.g. flashing, caulk)Flashin <br />M ounttng Ey st efi Informati on : <br />l. Is the mounting structure an e_!Sineered product designed to mount PV modules with no more than an 18" gap <br />beneath the module frames? LjYes LINo <br />If No, provid.e details oJ structural attachment certified by a design WJessionaL <br />2. For manufactured mounting sysrems, hll out information on the mounring system below: <br />a. N4ounting Sys tem Manufacrurer SWH producr Name and 14o6"11Solar Mount <br />b. Total Weight of PV Modules and Rails <br />c. Total Number of Attachment Points <br />598 bs <br />18 <br />d. Weight per Atrachment Point (b+c) 3322 lbs (rfgreater than 45 lbs, see WlGl) <br />e. N4aximum Spacing Between Arrachment Points on a Rail 72 nches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. Toral Surface Area of PV Modules (square feet)229.U <br />g. Distribured Weighr of PV Module on Roof (b + f)2.61 Ibsi ft'? <br />IJ distributed weight ol the PV system is greatet than 5 lbste, see WKSI . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />ln order for a PV s)6tem to be consider€d for an expedited permit process, the following must apply: <br />l. Pv modules, utility-interactive inverters. and combiner boxes are identihed for use in Pv systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total inverter capacity has a continuous ac power output 13,440 Watts or less <br />4. The ac interconnection poinr is on the load side of service disconnecring means (690.64(8)). <br />5. One of rhe sEndard elecftical diagrams (El .l , E l .l a, E l .1b, or E1 .1c) can be used ro accurarely represenr rhe Pv <br />system. lnteractive PDF diagrams are available at www.solarabcs.org/permifting. <br />Fill out the standard electricd.l diagram completely. A g\id.e to the electrical diagram is ptovided to help the arylicont <br />understand each blank to lll in. If the electrical system is morc conpler than the standard electrical diagram can elfectively <br />communicate, proyide an alterna.tiye dio.gran with awropiate detail. <br />2 EXPEDITED PERMIT PROCESS FOR PV SYSTEMS - MICRO-INVERTER
The URL can be used to link to this page
Your browser does not support the video tag.